The Sir Leo Hielscher Bridges, formerly and still collectively referred to as the Gateway Bridge, are a pair of twin road bridges that carry the Gateway Motorway (M1) over the Brisbane River, skirting the eastern suburbs of the city of Brisbane. The western bridge carries traffic to the north and the eastern bridge carries traffic to the south. They are the most eastern crossings of the Brisbane River and the closest to Moreton Bay, crossing at the Quarries Reach and linking the suburbs of Eagle Farm and Murarrie. The original western bridge (formerly named the Gateway Bridge) was opened on 11 January 1986 and cost A$92 million to build.<ref name=Pitt>Template:Citation</ref><ref name="cm1">Template:Cite news</ref> The duplicate bridge was opened in May 2010, and cost $350 million.<ref name=Pitt/>

In February 2010, the Queensland Government renamed the Gateway Bridge and its duplicate the Sir Leo Hielscher Bridges.<ref name="Ministerial Media Statement">Template:Cite web</ref><ref name="Brisbane Times">Template:Cite web</ref> Following the announcement, an opinion poll conducted by Brisbane's Channel Nine News showed that 97% of people were against the decision to rename the bridge and that most would continue to call it the Gateway Bridge.<ref>Channel Nine News, 12 February 2010</ref>Template:Citation needed

A public open day for the duplicate bridge was held on 16 May 2010 and the new bridge was opened to traffic on 22 May 2010, six months ahead of schedule. Following the opening, the old bridge was refurbished, three vehicle lanes at a time. From November 2010 the two bridges carry 12 lanes of vehicle traffic (six in each direction).<ref>Channel Seven News, 13 February 2010</ref><ref name="Queensland Newspapers">Template:Cite news</ref> The associated upgrade of the Gateway Motorway south of the bridge was completed in May 2010 to coincide with the new bridge opening.<ref>Template:Citation</ref>

To pay for the duplication of the bridge, a toll was imposed on the original bridge in 2005, and on the new bridge when the latter opened.<ref name="abc">Template:Cite web</ref> The bridges are tolled using the Linkt (formerly go via) electronic system and will remain so until 2051.<ref>Template:Cite web</ref> The toll booths were removed and free flow tolling began in July 2009.<ref name="abc2">Template:Cite web</ref> The booth removal saw an immediate drop in road crashes due to the reduction in queuing and weaving at the toll booths on the southern approach.<ref name="abc2"/>

History

[edit]
File:Opening of Gateway Bridge in Brisbane, January 1986.jpg
Opening of the first Gateway Bridge span, January 1986
File:Gateway Bridge aerial3.JPG
Gateway Bridge construction
File:Gateway Bridge aerial2.JPG
Gateway Bridge construction

Construction on the Gateway Bridge commenced on 5 June 1980. The construction of the bridge started before the design was completed, to fast track its construction. It was officially commissioned on 11 January 1986. On this day 200,000 people crossed the bridge by foot as part of the opening activities.<ref name="cm1"/>

In 1986 the bridge carried an average of 12,500 vehicles per day.<ref name="bt1">Template:Cite web</ref> In 2001 the bridge was crossed by 27 million vehicles (approximately 73,975 vehicles per day).<ref name="abc3">Template:Cite web</ref> In early 2010 the single bridge was carrying an average of 100,000 vehicles per day.<ref name="bt1"/>

The annual Bridge to Brisbane fun run has begun from the southern entrance to the bridge from its first year until 2015, when it was moved, and again since 2021, after being moved back.<ref>Template:Cite web</ref>

Design

[edit]
File:Gateway Bridge aerial4.JPG
Gateway Bridge

In 1979, a tender was called by the Queensland Main Roads Department for a new bridge crossing of the Brisbane River. The conforming design main span was designed as a balanced cantilever with two raised post tensioned concrete compression stays located on the median and over each of the two main piers to support the 260-metre span. Due to the proximity of the Brisbane Airport, an overall structural height constraint was provided due to aircraft flight path and clearances. This constraint ruled out the possibility of a conventional cable-stayed bridge due to the height of the pylons that would be required. Due to cost considerations, an alternative design concept was proposed by Bruce Ramsay (Manager Engineering) of VSL. This alternative design required a world record main span of 260 m for a free cantilever, concrete box girder bridge. The concept was adopted by one of the tenderers – Transfield Queensland Pty.Ltd. who was subsequently awarded the project on the basis of this alternative. It held the record span of 260 m for over 15 years. The box girder is still the largest prestressed concrete, single box in the world, measuring 15 m deep at the pier, with a box width of 12 m and an overall deck width for the six lanes of 22 m.<ref>Template:Citation</ref>

As stated above the bridge owes its distinctive shape to air traffic requirements restricting its height to under Template:Convert above sea level (all features of the bridge including light poles) coupled with shipping needs requiring a navigational clearance of Template:Convert.<ref>Template:Cite web</ref>

The bridge has six lanes (originally three lanes in each direction, which were subsequently reconfigured to six lanes of northbound traffic after opening of the duplicate bridge).Template:Citation needed

The bridge was financed by funds borrowed by the Queensland Government, and as a result, users of the bridge pay a toll when crossing the bridge in either direction. The bridge is operated and maintained by Transurban Queensland.<ref>Template:Cite web</ref>

The total length is Template:Convert. This is divided into a southern approach of Template:Convert, a northern approach of Template:Convert and the three central spans of Template:Convert. The record main span is Template:Convert long by Template:Convert high, which is equivalent to a 20-storey building. A total of 150,000 tonnes (165,000 short tons) of concrete was used to construct the bridge.Template:Citation needed

The original design did not include a safety fence to prevent suicide attempts and base jumping.<ref name="cm1"/> Three-metre high safety fences attached to the top of the concrete traffic barrier were later installed to prevent these incidents occurring.<ref name="bt2">Template:Cite web</ref> Anti-climbing screens are part of the second bridge's security features.<ref name="bt2"/>

Duplication

[edit]
File:Gateway Bridge - Construction view from Paringa Rd.JPG
Gateway Bridges from south bank of Brisbane River (Rivergate Marina)
File:Gateway bridges pathways.JPG
Park and pathway on south side

In 2005, a major upgrade of the Gateway Motorway was announced.<ref name="abc"/> Leighton Contractors and joint venture partner Abigroup won the contract to upgrade the motorway. The A$1.88 billion Gateway Upgrade Project includes the duplication of the Gateway Bridge and upgrades to Template:Convert of the Gateway Motorway from Mt Gravatt-Capalaba Road in the south to Nudgee Road in the north. The bridge duplication was the largest bridge and road development in Queensland's history.<ref name="aus">Template:Cite web</ref> The duplicate bridge was specified to have a design life of 300 years.<ref>Template:Cite web</ref>

To the south, the upgrade included widening Template:Convert of the Gateway Motorway from 4 to 6 lanes. To the north, it involved the construction of the Template:Convert Gateway Motorway deviation, an entirely new six-lane motorway between the Gateway Bridge and Nudgee Road. The deviation runs east of the original motorway through Brisbane Airport Corporation land and provides an alternative means of access to Brisbane Airport (the only effective access from the south). The new bridge provides a bicycle path unlike the first crossing.<ref name="bt1"/>

The Wynnum Road upgrade was completed on 13 July 2007 and 2 additional southbound lanes between the Port of Brisbane Motorway and Wynnum Road completed in late 2007. Four of six lanes of the new Gateway Motorway deviation were opened in July 2009. All works south of the river were complete by the end of 2009 after 10 years of constant roadwork and traffic disruption. The final concrete pour linking the sides of the new bridge was made in late October 2009.<ref name="bt1"/> A total of 748 concrete segments, which are supported by 17 piers, were placed for the new bridge.<ref name="aus"/>

The duplicate bridge was completed in May 2010 along with the remaining lanes of the Gateway Motorway deviation.<ref>Template:Cite web</ref>

In October 2010, then Minister for Main Roads, Craig Wallace, announced that the original course of the Gateway Motorway via Eagle Farm would be renamed to Southern Cross Way, after Sir Charles Kingsford Smith's aircraft, the Southern Cross, which landed at Eagle Farm in 1928, and so as to avoid confusion with the newly opened Gateway Motorway deviation.<ref>Template:Cite web</ref> The new Gateway Motorway deviation was given the name Gateway Motorway. However, like the renaming of the bridges themselves, the change to Southern Cross Way was not without controversy, attracting criticism from the then Shadow Minister for Main Roads and Transport, Fiona Simpson.<ref>Template:Cite news</ref>

Refurbishment of the existing bridge was completed in November 2010.<ref name="Queensland Newspapers"/>

Awards

[edit]

In 2009 as part of the Q150 celebrations, the Gateway Bridge was announced as one of the Q150 Icons of Queensland for its role as a "structure and engineering feat".<ref>Template:Cite web</ref>

See also

[edit]

Template:Portal

Template:Clear

References

[edit]

Template:Reflist

[edit]

Template:Commons category

Template:Brisbane bridges navigation Template:Brisbane landmarks