Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Queensway Tunnel
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
{{Short description|Road tunnel running under the River Mersey connecting Liverpool and Wirral}} {{Use British English|date=February 2017}} {{Use dmy dates|date=February 2017}} {{Infobox tunnel |name = Queensway Tunnel |image = Queensway Road Tunnel Entrance, Liverpool (geograph 2974781).jpg |caption = The Liverpool entrance to the Queensway Tunnel |route = Queens Way |location = [[Merseyside]], England |coordinates = |status = Active |start = [[Liverpool]], [[Merseyside]] |end = [[Birkenhead]], Merseyside |opened = 18 July 1934 |close = |owner = [[Merseyside Passenger Transport Executive|Merseytravel]] |operator = |traffic = Automotive |character = |toll = £2.10 for a car (£1.40 for LCR fast-tag) <ref name="toll">{{cite web|url= https://www.merseytravel.gov.uk/tunnels/tolls-fees-and-charges/ |title=Tolls, Fees and Charges|work=Mersey Tunnels|access-date=1 May 2024}}</ref> |construction = 1925–1934 |speed = |lanes = 4 (2 northbound, 2 southbound) |hielevation = |lowelevation = |height = |grade = |}}{{For|the tunnel in Birmingham|Queensway, Birmingham}} The '''Queensway Tunnel''' ([[Road signs in the United Kingdom|signposted]] as the '''Birkenhead Tunnel''' or '''B'head Tunnel''') is a road tunnel under the [[River Mersey]], in the [[North West England|north west]] of [[England]], between [[Liverpool]] and [[Birkenhead]]. Locally, it is often referred to as the "old tunnel", to distinguish it from the newer [[Kingsway Tunnel]] (1971), which serves [[Wallasey]] and the [[M53 motorway]] traffic. At {{convert|2.13|mi|km}} in length, it is the longest road tunnel in the UK. ==History== ===Planning and construction=== The first tunnel under the [[River Mersey]] was for the [[Mersey Railway]] in 1886. The first tunnel crossing was proposed in 1825, and again in 1827. A report in 1830 rejected the road tunnel due to concerns about building damage. During the 1920s there were concerns about the long queues of cars and lorries at the [[Mersey Ferry]] terminal, so once [[royal assent]] to a parliamentary bill was received, construction of the first Mersey road tunnel started in 1925, to a design by consulting engineer Sir [[Basil Mott]]. Mott supervised the construction in association with [[John Alexander Brodie|John Brodie]], who, as City Engineer of Liverpool, had co-ordinated the feasibility studies made by consultant Engineers Mott, Hay and Anderson. The [[General contractor|main contractor]] was [[Edmund Nuttall Limited|Edmund Nuttall]].<ref>{{cite news|url=http://www.liverpooldailypost.co.uk/views/obituaries/2007/08/09/sir-nicholas-nuttall-64375-19597612/|title=Sir Nicholas Nuttall|work=Liverpool Daily Post|date=9 August 2007|first=Peter|last=Elson|archive-url=https://web.archive.org/web/20081123014743/http://www.liverpooldailypost.co.uk/views/obituaries/2007/08/09/sir-nicholas-nuttall-64375-19597612/|archive-date=23 November 2008|url-status=live}}</ref> In 1928 the two pilot tunnels met to within less than {{convert|25|mm|1}}. Construction work continued, and in 1930 Brian Colquhoun was appointed Resident Engineer.<ref name=BC>{{cite web |url = https://archivesearch.lib.cam.ac.uk/repositories/9/resources/1497 |title = The Papers of Brian Colquhoun |author= |year= |publisher = University of Cambridge |location= |page= |archive-url= |archive-date= |access-date = 8 November 2023 |quote= }}</ref> From 1933 to 1936 Colquhoun was redesignated ''Resident Engineer-in-Charge''.<ref name=BC/> More than 1.2 million tons of rock, gravel, and clay were excavated; some of it was used to build [[Otterspool Promenade]]. Of the 1,700 men who worked on the tunnel during the nine years of its construction, 17 were killed.<ref>{{cite news |url=https://www.liverpoolecho.co.uk/news/liverpool-news/17-deaths-250-tonnes-explosive-13696923 |publisher=Liverpool Echo |title=17 deaths and 250 tonnes of explosive: The real story behind Merseyside's tunnels |author=Lorna Hughes |date=6 October 2017 |access-date=4 May 2025}}</ref> ===Opening=== At the time of its opening in 1934, it was the longest road tunnel in the world, a title it held for 14 years until the opening of the [[Vielha Tunnel]] in [[Catalonia]], Spain, in 1948, though it remained the longest underwater tunnel as of 1955.<ref>{{cite book|title=Guinness World Records 2015|date=September 2014 |publisher=The Jim Pattison Group|isbn=978-1-908843-62-3|page=184|edition=British}}</ref> The tunnel, which cost a total of £8 million, was opened on 18 July 1934 by [[George V of the United Kingdom|King George V]]; the opening ceremony was watched by 200,000 people. At the time it was known as the eighth wonder of the world.<ref name=coslett>{{cite web|url=https://www.bbc.co.uk/liverpool/content/articles/2006/12/04/local_history_queensway_tunnel_feature.shtml|first=Paul|last=Coslett|title=Queensway Tunnel: The Queensway Tunnel celebrates 75 years of operation this year with a special walk through |publisher=BBC|date=4 December 2006|access-date=24 April 2016}}</ref> ===Operation=== [[Image:Liverpool Queensway Tunnel ventilation tower and offices Pierhead.jpg|thumb|[[George's Dock Building|George's Dock ventilation and control station]], Pier Head]] By the 1960s, traffic volume had increased, and, in 1971, the [[Kingsway Tunnel]] opened to relieve congestion. In 1984, the lighting system underwent a major upgrade to improve visibility and safety, as the low light levels were contributing to an increased risk of accidents. The outdated wall-mounted lights were replaced with modern overhead fixtures. Rather than using traditional scaffolding, double-decker buses were purchased and modified by removing their roofs, allowing workers to move easily along the tunnel's length. These buses also provided on-board toilet and catering facilities. The £1 million scheme also included re-cladding and a repaint of the tunnel. The upgraded lighting was officially switched on in June 1984.<ref>{{cite news |url=https://www.newspapers.com/article/liverpool-echo/171562187/ |newspaper=Liverpool Echo |title=Brighter lights go up in Queensway Tunnel |page=14 |date=13 June 1984}}</ref> Alongside the lighting upgrade were also resurfacing works, costing around £500,000.<ref>{{cite news |url=https://www.newspapers.com/article/liverpool-echo/171679008/ |newspaper=Liverpool Echo |title=Brighter tunnel lies ahead... |page=2 |date=27 August 1982}}</ref> On 17 July 1994, the tunnel was closed for the day and was used for pedestrians only to celebrate its 60th anniversary.<ref>{{cite news |url=https://www.newspapers.com/article/liverpool-echo/171561118/ |newspaper=Liverpool Echo |title=Queensway Tunnel Diamond Jubilee: Traffic and Transport Information |page=26 |date=15 July 1994}}</ref> Official estimates put the number of people walking through the tunnel in excess of 20,000, while a concert in the tunnel had to be abandoned due to fears of crushing.<ref>{{cite news |url=https://www.newspapers.com/article/daily-post-merseyside-ed/171561286/ |newspaper=Daily Post |title=Human Traffic Jam |page=1 |date=18 July 1994}}</ref> In April 2004 construction began on seven emergency refuges below the road deck, each capable of holding 180 people, as part of a £9 million project to bring the tunnel into line with the highest European safety standards. Each refuge is {{convert|21|m}} long and {{convert|3|m}} wide, accessible from the main tunnel walls. The refuges have fire resistant doors, ramps for wheelchair access, a supply of bottled water, a toilet, and a video link to the [[Mersey Tunnels Police]] control room. All seven refuges are linked by a walkway below the road surface, with exits at the Liverpool and Birkenhead ends.{{citation needed|date=September 2016}} In 2012 the tunnel was refurbished, with 5,999 added panels – ceramic steel cladding replacing the old plastic corrugated wall cladding to improve lighting and to give the tunnel a 21st century look.<ref>{{cite news|first=Alan|last=Weston|title=Artwork incorporated in Mersey Tunnel refurbishment|url=http://www.liverpoolecho.co.uk/news/liverpool-news/artwork-incorporated-mersey-tunnel-refurbishment-3356267|access-date=19 July 2014|newspaper=[[Liverpool Echo]]|date=28 Jan 2012}}</ref> ==Design and facilities== [[File:Mersey Tunnel Toolbooths, Birkenhead - geograph.org.uk - 342189.jpg|thumb|Toll booths at the Birkenhead entrance to the Queensway Tunnel]] The tunnel is {{convert|2.13|mi|km}} long.<ref name=bbc80 /> It contains a single carriageway of four lanes, two in each direction. A lower deck, originally intended as a tramway, is used for ventilation<ref name=bbc80>{{cite news|url= https://www.bbc.co.uk/news/uk-england-merseyside-28372224|title= Queensway tunnel's 80th anniversary celebrated|author=BBC News|work= BBC News|date=19 July 2014}}</ref><ref>{{cite web|url= https://www.kimpton.co.uk/work-begins-queensway-tunnel/|title= Work begins on the £3m Kingsway Tunnel Refurbishment|date=12 March 2020|author=Kimpton Energy Solutions|accessdate=20 December 2022}}</ref> and emergency refuges.<ref name=coslett/> The tunnel entrances, toll booths and ventilation building exteriors were designed by architect [[Herbert James Rowse]], who is frequently but incorrectly credited with the whole civil engineering project. Their decoration is by [[Edmund Thompson]].<ref>{{Cite episode | title = Port Sunlight 2 | series = [[Antiques Roadshow]] | url = http://www.bbc.co.uk/programmes/b01nmdxm | access-date = 21 October 2012 | network = [[BBC]] | date = 21 October 2012 | series-no = 35 | number = 3 }}</ref> These are Grade II [[listed building]]s. [[File:Queensway tunnel pylon in Birkenhead.JPG|thumb|left|upright|One of the original Art Deco lamp pillars from Birkenhead, now the [[Monument to the Mersey Tunnel]]]] Different height restrictions apply to the nearside and offside lanes in each direction, because of the curvature of the tunnel. These are {{convert|3.9|m}} and {{convert|4.75|m}} respectively, and there is a 3.5 t weight limit for goods vehicles. All buses are required to use the offside lane, regardless of their height. Lane signals (consisting of an illuminated green arrow or red cross) are displayed at regular intervals, although in normal circumstances none of the lanes are currently used bidirectionally. This is in contrast to the [[Kingsway Tunnel]], where lanes in toll concourse are alternated to prioritise higher traffic in one direction during peak hours. The tunnel has two branches leading off the main tunnel to the dock areas on both sides of the river. The Birkenhead branch tunnel (known as the Rendel Street branch, or Dock Exit) was closed in 1965. When travelling in the Birkenhead direction, the branch can still be seen inside the tunnel on the right just before the left hand bend towards the Birkenhead exit. The exit of this branch can also be seen on the outside from Rendel Street near the junction with Marcus Street, just north of Cleveland Street in [[Birkenhead]]. This branch also carried two-way traffic, single lane each way. It was also controlled by traffic lights inside the tunnel. This branch mainly served Birkenhead docks and for people travelling to the Wirral resort of New Brighton. These are now best served by the Kingsway Tunnel. The Liverpool branch tunnel remains in use, in the exit direction only. It emerges opposite the [[Royal Liver Building|Liver Building]], next to the Atlantic Tower Hotel and [[Church of Our Lady and Saint Nicholas, Liverpool|Church of Our Lady and Saint Nicholas]]. Originally, it carried two-way traffic and the junction inside the tunnel was controlled by traffic lights, but this arrangement was discontinued to reduce the delays brought on by increasing traffic levels. Had it been built, the tunnel would have connected with the Liverpool urban motorway, the planned inner ring road. ===Tolls=== [[File:Tunnel Tollbooth - geograph.org.uk - 1454533.jpg|thumb|An original tollbooth, now preserved in Liverpool]] Tolls have been a feature of tunnel use since the Queensway Tunnel opened in 1934. Although residents were originally told tolls would be removed when debts were repaid, this position was dropped long ago. Debts and tolls were increased when the Kingsway Tunnel was built in 1971 to relieve congestion in the first tunnel. The [[County of Merseyside Act 1980]] (c. x) enshrined in law the right to continue collecting tolls once the debts were repaid. The later [[Mersey Tunnels Act 2004]] (c. ii) created a legal position where tolls charged must rise in line with the [[Retail Price Index]] (RPI) as published in November.<ref>David Bartlett (10 January 2013) [http://www.liverpoolecho.co.uk/news/liverpool-news/mersey-tunnels-still-owe-58m-3324486 "Mersey Tunnels still owe £58m but tolls income is being used elsewhere"] [[Liverpool Echo]]: Retrieved 6 December 2019</ref> {{As of|May 2024}} the toll is £2.10 per journey<ref name="toll"/> for a single passenger car of typical size, with progressively higher tolls for larger vehicles; solo motorcycles are free.<ref name="toll" /> [[Annual average daily traffic|Average daily traffic]] through the tunnel currently stands at 35,000 vehicles, which equates to just under £12.8 million per year.<ref name=EchoHP/> ===Ventilation=== As a roadway the tunnel requires ventilation to clear vehicle exhaust fumes. As originally designed the tunnel would have used forced air for ventilation; fumes and noxious gases were simply to be expelled through the tunnel exits. However, in an incident in the [[Liberty Tunnel]] in [[Pittsburgh]] in May 1924, inadequate ventilation led to a number of drivers being overcome by [[carbon monoxide poisoning]], though there were no fatalities; this led the Queensway engineers to re-examine the issue and to conduct experiments in a completed section under Hamilton Square. Extractors were installed in the planned ventilation stations, adding to their size and complexity, and also adding considerably to the budget.<ref>Ian Jackson, Simon Pepper, Peter Richmond ''Herbert Rowse'', p46 (2019) Historic England {{ISBN|978-1-84802-549-3}}</ref> The tunnel currently has six ventilation shafts, three on each side of the river. On the Wirral side the main shaft is at Woodside, with another (before the main exit) in Sidney Street, while the Dock Exit branch is served by the tower in Taylor Street. On the Liverpool side the main shaft is at the Pier head, in the [[George's Dock Building]], with another (before the main exit) in North John Street, and the Strand Exit branch is served by the tower in Fazakerley Street. The Georges Dock Building also houses offices of the Tunnels Authority and of the Tunnels Police Force. All the ventilation buildings were designed by Herbert Rowse, chief architect for the Queensway tunnel exteriors, and all are [[Grade II]] [[listed building|listed]]. <gallery> File:Queensway Tunnel ventilator, Taylor Street 4.jpg|Taylor Street ventilator, Wirral File:Queensway Tunnel ventilator, Sidney Street 1.jpg|Sidney Street ventilator, Wirral File:Birkenhead Tower seen from Liverpool - panoramio.jpg|Woodside main ventilator, Wirral File:George's Dock Ventilation and Control Station 2018-1.jpg|Georges Dock main ventilator, Liverpool File:Ventilation Station, North John Street.jpg|North John Street ventilator, Liverpool File:Queensway Tunnel ventilator, Fazakerley Street.jpg|Fazakerley Street ventilator, Liverpool </gallery> {{clear left}} ==Use in film== The tunnel was used in the 1993 film ''[[In the Name of the Father]]'' where [[Emma Thompson]]'s character drives through the tunnel in one of the opening scenes.<ref> {{cite web|url=https://www.latlong.net/location/in-the-name-of-the-father-locations-930#:~:text=In%20the%20Name%20of%20the%20Father%20was%20shot%20in%20Dublin,Kilmainham%20Gaol%2C%20Dublin%2C%20Ireland. | title=In the Name of the Father Locations }}</ref> In September 2009, a scene from ''[[Harry Potter and the Deathly Hallows – Part 1]]'' set in the [[Dartford Crossing]] was filmed in Queensway Tunnel, where Harry skips on a bus while on Hagrid's enchanted motorbike was filmed in the tunnel.<ref name=EchoHP>{{cite news|url=http://www.liverpoolecho.co.uk/liverpool-news/local-news/2010/12/04/harry-potter-film-tour-for-queensway-tunnel-after-deathly-hallows-filming-100252-27765611/| title=Harry Potter film tour for Liverpool Queensway tunnel after Deathly Hallows filming|work=Liverpool Echo|date=4 December 2010|first=Alan|last=Weston|access-date=22 November 2015}}</ref> In 2012 the tunnel was used for the filming of a chase scene for ''[[Fast & Furious 6]]''.<ref>{{cite web|last1=Miles|first1=Tina|title=Liverpool gets Fast and Furious film location boost|url=http://www.liverpoolecho.co.uk/whats-on/film-tv/fast-furious-6-gives-liverpool-3477384|website=liverpoolecho|access-date=22 December 2017|date=8 May 2013}}</ref> In March 2018, the tunnel was used for the filming of ''[[Yesterday (2019 film)|Yesterday]]'', directed by Danny Boyle.<ref>{{cite web |last1=Hughes |first1=Lorna |title=You can't make a film about The Beatles without going to Liverpool |url=https://www.liverpoolecho.co.uk/whats-on/film-news/if-you-make-film-beatles-16463828 |website=liverpoolecho |access-date=13 July 2019 |date=24 June 2019}}</ref> The two main characters are frolicking in an empty tunnel when the bright yellow words "Hello Goodbye" are rolling through the tunnel. Also in 2018 the tunnel was a location for the BBC TV series [[The City and the City (TV series)|''The City and the City'']], where it served as the gateway between the two cities. ==In popular culture== [[The Dubliners]] popularised the song "I Wish I Was Back in Liverpool", which includes a verse about the building of the Queensway Tunnel. ==See also== * [[Architecture of Liverpool]] * [[Listed buildings in Birkenhead]] ==References== {{reflist|30em}} ==Further reading== * Moore, Jim (1998) ''Underground Liverpool'', Liverpool : Bluecoat Press, {{ISBN|1-872568-43-2}} * Ian Jackson, Simon Pepper, Peter Richmond: ''Herbert Rowse'' (2019) Historic England {{ISBN|978-1-84802-549-3}} ==External links== {{Commons category}} *[http://www.merseytunnels.co.uk/ Official website of the Mersey Tunnels] {{coord|53.4009|-3.0031|region:GB_type:landmark_scale:5000_source:Google|display=title}} {{River item box|type = tunnel}} {{S-start}} {{S-ach|rec}} {{S-bef|before=[[Col de Tende Road Tunnel]]<br /><small>3.18 km (1.97 mi)</small>}} {{S-ttl|title=World's longest road tunnel|years=1934-1948}} {{S-aft|after=[[Vielha Tunnel]]<br /><small>5.23 km (3.25 mi)</small>}} {{S-end}} {{Liverpool B&S}} {{Transport in Merseyside}} [[Category:Transport in Merseyside]] [[Category:Transport in Liverpool]] [[Category:Toll tunnels in the United Kingdom]] [[Category:Grade II listed buildings in Liverpool]] [[Category:Road tunnels in England]] [[Category:Tunnels completed in 1934]] [[Category:Art Deco architecture in Liverpool]] [[Category:Tunnels in Merseyside]] [[Category:Tunnels in Liverpool]] [[Category:1934 establishments in England]]
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Templates used on this page:
Template:As of
(
edit
)
Template:Citation needed
(
edit
)
Template:Cite book
(
edit
)
Template:Cite episode
(
edit
)
Template:Cite news
(
edit
)
Template:Cite web
(
edit
)
Template:Clear left
(
edit
)
Template:Commons category
(
edit
)
Template:Convert
(
edit
)
Template:Coord
(
edit
)
Template:For
(
edit
)
Template:ISBN
(
edit
)
Template:Infobox tunnel
(
edit
)
Template:Liverpool B&S
(
edit
)
Template:Reflist
(
edit
)
Template:River item box
(
edit
)
Template:S-ach
(
edit
)
Template:S-aft
(
edit
)
Template:S-bef
(
edit
)
Template:S-end
(
edit
)
Template:S-start
(
edit
)
Template:S-ttl
(
edit
)
Template:Short description
(
edit
)
Template:Transport in Merseyside
(
edit
)
Template:Use British English
(
edit
)
Template:Use dmy dates
(
edit
)
Search
Search
Editing
Queensway Tunnel
Add topic