Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
River Aire
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Leeds flood alleviation scheme== In October 2017 at Crown Point near Leeds city centre and [[Knowsthorpe|Knostrop]] two movable weirs, the first in the UK, were installed in the first phase of a two phase plan to reduce floods. Reducing the height of the weir, by deflating a 'bladder' has the potential to reduce flood levels by up to one metre upstream. The Knostrop weir was operated during the [[2019 England floods]].<ref>{{cite web|url=https://www.leeds-live.co.uk/news/leeds-news/live-leeds-weather-rain-flooding-17217110|title=Live: Leeds trains cancelled and diverted but flood warnings lifted|last1=Millington|first1=Matt|last2=Johnson|first2=Kristian|date=8 November 2019|website=leedslive|access-date=17 November 2019|last3=Ovens|first3=Ruth}}</ref> A 600m stretch of land, Knostrop Cut island, was removed allowing the river and canal to merge creating additional flood water capacity. Adrian Gill, area flood risk manager at the [[Environment Agency]] said, "The scheme has reduced the risk of flooding to 3,000 homes, 500 business and 300 acres of development land south-east of Leeds Train Station to Woodlesford".<ref>{{cite web|url=https://www.leeds.gov.uk/parking-roads-and-travel/flood-alleviation-scheme/flood-alleviation-scheme-phase-one|title=Leeds Flood Alleviation Scheme: Phase One|website=www.leeds.gov.uk|accessdate=17 November 2019|archiveurl=https://web.archive.org/web/20200604113900/https://www.leeds.gov.uk/parking-roads-and-travel/flood-alleviation-scheme/flood-alleviation-scheme-phase-one|archivedate=4 June 2020|url-status=dead}}</ref> Phase two will use natural flood management techniques to help slow the flow, helping to protect a further 1,048 homes and 474 businesses. Work on phase two, designed to provide a one-in-100 year level of protection, will take place on an 8 km stretch upstream of Leeds station starting in late 2019. A pilot scheme, costing Β£500,000 is underway (in November 2019). If additional funding can be secured the flood plain near Calverley will be used for water storage providing a one-in-200 year level of protection.<ref>{{cite web|url=https://www.leeds.gov.uk/parking-roads-and-travel/flood-alleviation-scheme/flood-alleviation-scheme-phase-two|title=Leeds Flood Alleviation Scheme: Phase two|website=www.leeds.gov.uk|access-date=17 November 2019}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
River Aire
(section)
Add topic