Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Mont Blanc
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Tunnel === {{Main|Mont_Blanc_Tunnel|l1=Mont Blanc Tunnel}} [[File:Tunel mont blanc.jpg|thumb|Entrance of the Mont Blanc Tunnel in Italy]] In 1946, a drilling project was initiated to carve a tunnel through the mountain. The Mont Blanc tunnel would connect [[Chamonix]], France, and [[Courmayeur]], Italy, and become one of the major transalpine transport routes between the two countries. In 1965, the tunnel opened to vehicle traffic with a length of {{convert|11611|m|mi}}.<ref>{{cite web |url=http://www.atmb.com/atmb/en/tunnel/26/the-mont-blanc-tunnel/the-history-of-the-tunnel.html |title=Timeline of the Mont Blanc Tunnel |website=atmb.com |access-date=23 October 2017 |url-status=dead |archive-url=https://web.archive.org/web/20140104022749/http://www.atmb.com/atmb/en/tunnel/26/the-mont-blanc-tunnel/the-history-of-the-tunnel.html |archive-date=4 January 2014}}</ref> ==== 1999 disaster ==== {{main|Mont Blanc tunnel fire}} In 1999, a transport truck caught fire in the tunnel beneath the mountain. In total, 39 people were killed when the fire raged out of control. The tunnel was renovated in the aftermath to increase driver safety. Renovations include computerised detection equipment, extra security bays, a parallel escape shaft, and a fire station in the middle of the tunnel. The escape shafts also have clean air flowing through them via vents. Any people in the security bays now have live video contact to communicate with the control centre. A remote site for cargo safety inspection was created on each side: Aosta in Italy and Passy-Le Fayet in France. Here all trucks are inspected before entering the tunnel. These remote sites are also used as [[staging area]]s to control commercial traffic during peak hours. The renovated tunnel reopened three years after the disaster.<ref name="tunneltalk">{{cite web |url=http://www.tunneltalk.com/Mont-Blanc-Tunnel-Sep11-An-historic-review-46-years-of-operation.php |title=Mont Blanc Tunnel |website=www.tunneltalk.com |access-date=23 October 2017 |archive-date=24 October 2017 |archive-url=https://web.archive.org/web/20171024101747/https://www.tunneltalk.com/Mont-Blanc-Tunnel-Sep11-An-historic-review-46-years-of-operation.php |url-status=live }}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Mont Blanc
(section)
Add topic