Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Interstate 4
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====I-4 Ultimate Project==== [[File:I-4 Ultimate Express Lanes.jpg|alt=An aerial view of the I-4 Ultimate Express Lanes near Winter Park, FL.|left|thumb|upright=0.75|An aerial view of the I-4 Ultimate Express Lanes near Winter Park]] A $2.3-billion (in year-of-expenditure dollars) project—dubbed I-4 Ultimate—reconstructed a {{convert|21|mi|km|adj=on}} stretch of I-4 through Orlando from SR 435 (exit 75) east to SR 434 (exit 94).<ref>{{cite web |author = Staff |url = http://www.moving-4-ward.com |title = Future I-4 Improvements |work = Moving-4-Ward |publisher = Florida Department of Transportation |access-date = February 18, 2013 }}</ref> The most noticeable change is the addition of four [[High-occupancy toll lane|variable-toll express lanes]] along this section, called I-4 Express.<ref name=":0" /><ref name=":1" /> The toll rates maintain an average speed of {{convert|60|mph|km/h|abbr=on}}. Additionally, the general-use lanes were rebuilt, 15 major interchanges were reconfigured, 53 new bridges were added, and 75 bridges were replaced.<ref name="I-4 Ultimate FAQ">{{cite web |title = FAQs |url = http://i4ultimate.com/project-info/faqs/ |website = I-4 Ultimate |date = July 9, 2014 |publisher = Florida Department of Transportation |access-date = January 22, 2015 }}</ref> A pedestrian bridge was built over the highway near Maitland Boulevard, with a second pedestrian bridge being built over SR 435 at the intersection with both Major Boulevard and Tom Williams Way.<ref name="I-4 Ultimate Special features">{{cite web |title = Special Features |url = http://i4ultimate.com/project-info/special-features/ |website = I-4 Ultimate |date = July 9, 2014 |publisher = Florida Department of Transportation |access-date = February 19, 2015 }}</ref> A pedestrian tunnel was constructed under SR 436. The project also reduced the curve radius and improved line-of-sight along the notorious Fairbanks Curve south of [[Fairbanks Avenue]], which is the most accident-prone section of I-4.<ref name="I-4 Ultimate: Fairbanks Curve">{{cite web |title = Fairbanks Ave. / Winter Park |url = http://i4ultimate.com/project-info/future-i-4/#info587 |website = I-4 Ultimate |date = July 9, 2014 |publisher = Florida Department of Transportation |access-date = February 19, 2015 }}</ref><ref name="WFTV: Fairbanks Curve">{{cite news |title = I-4 Ultimate Project to Address Dangerous Fairbanks Curve |url = http://www.wftv.com/news/news/local/i-4-ultimate-project-addres-dangerous-fairbanks-cu/nkDhP/ |access-date = February 19, 2015 |location = Orlando |publisher = [[WFTV-TV]] |date = February 18, 2015 |archive-url = https://web.archive.org/web/20150219135323/http://www.wftv.com/news/news/local/i-4-ultimate-project-addres-dangerous-fairbanks-cu/nkDhP/ |archive-date = February 19, 2015 |url-status = dead }}</ref> FDOT proposed adding barrier-separated [[high-occupancy vehicle]] (HOV) lanes to I-4 through Greater Orlando in the 1990s, possibly funded by tolls,<ref name="I-4 special lanes 1993">{{cite news |last1 = Roy |first1 = Roger |title = Express Lanes Lead Alternatives to Avoid I-4 Jams |url = https://www.orlandosentinel.com/1993/08/23/express-lanes-lead-alternatives-to-avoid-i-4-jams/ |access-date = February 19, 2015 |work = Orlando Sentinel |date = August 23, 1993 |archive-date = February 19, 2015 |archive-url = https://web.archive.org/web/20150219150550/http://articles.orlandosentinel.com/1993-08-23/news/9308230319_1_express-lanes-new-lanes-special-lanes |url-status = live }}</ref><ref name="I-4 special lanes 1995">{{cite news |last1 = Roger |first1 = Roy |title = I-4 Plan: Promote Car Pools, Light Rail |url = https://www.orlandosentinel.com/1995/08/18/i-4-plan-promote-car-pools-light-rail/ |access-date = February 19, 2015 |work = Orlando Sentinel |date = August 18, 1995 |archive-date = February 19, 2015 |archive-url = https://web.archive.org/web/20150219150818/http://articles.orlandosentinel.com/1995-08-18/news/9508180126_1_kimbler-express-lanes-car-pools |url-status = live }}</ref> but proposals for express lanes (including reversible toll lanes and [[high-occupancy toll]] [HOT] lanes) were blocked by politics for the next 15 years. In 2012, a legislative ban on tolls along I-4, which had been in place for seven years, ended, and FDOT began soliciting private enterprises to build and help finance the project in a [[public–private partnership]].<ref name="Sentinel 2012: ban ends">{{cite news |last1 = Tracy |first1 = Dan |title = State Seeks Investors to Help Foot Bill to Build I-4 Toll Lanes |url = https://www.orlandosentinel.com/2012/07/08/state-seeks-investors-to-help-foot-bill-to-build-i-4-toll-lanes/ |access-date = February 19, 2015 |work = Orlando Sentinel |date = July 8, 2012 |archive-date = February 19, 2015 |archive-url = https://web.archive.org/web/20150219151148/http://articles.orlandosentinel.com/2012-07-08/news/os-interstate-4-tolls-20120708_1_lexus-lanes-toll-lanes-toll-money |url-status = live }}</ref> In February 2013, the state legislature and governor gave approval for FDOT to proceed with the public–private partnership on this section of I-4 in February 2013,<ref name="I-4 Ultimate approval to launch P3">{{cite news |last1 = Orben |first1 = Bill |title = FDOT Gets Backing on $2.1B I-4 Project |url = http://www.bizjournals.com/orlando/morning_call/2013/02/fdot-gets-backing-on-21b-i-4-project.html |work = Orlando Business Journal |access-date = February 19, 2015 |date = February 4, 2013 }}</ref> and, the following year, FDOT selected I-4 Mobility Partners to design, construct, finance, maintain, and operate the project for 40 years. FDOT and I-4 Mobility Partners reached commercial and financial close, and a public–private partnership concession agreement was executed in September 2014.<ref>{{cite press release |title = FDOT and I-4 Mobility Partners Reach Commercial and Financial Close for I-4 Ultimate Project |url = http://i4ultimate.com/documents/2014/09/2014-09-05-I-4-Ultimate-Press-Release-Fin-and-Comm-Close.pdf |website = I-4 Ultimate |publisher = Florida Department of Transportation |access-date = January 22, 2015 |date = September 9, 2014 }}</ref> The final design phase began in October 2014.<ref>{{cite news |last1 = Fluker |first1 = Anjali |title = FDOT Shares New I-4 Ultimate Design, Construction Milestones |url = http://www.bizjournals.com/orlando/blog/2014/11/fdot-shares-new-i-4-ultimate-design-construction.html?page=all |access-date = January 22, 2015 |work = Orlando Business Journal |date = November 3, 2014 }}</ref> On February 1, 2015, FDOT turned the project over to I-4 Mobility Partners,<ref name="I-4 Mobility Partners take over project">{{cite news |last1 = Vargas |first1 = Lena |title = I-4 Ultimate Project Underway in Orange, Seminole Counties |url = http://www.mynews13.com/content/news/cfnews13/news/article.html/content/news/articles/cfn/2015/2/1/i4_ultimate.html |access-date = February 18, 2015 |location = Orlando |publisher = Central Florida News 13 |date = February 2, 2015 }}</ref> and, on February 18, transportation officials and the governor held a groundbreaking ceremony for the project in Maitland.<ref name=Sentinel-groundbreaking>{{cite news |last1 = Tracy |first1 = Dan |title = I-4 Ultimate Overhaul Gets Ceremonial Start |url = http://www.orlandosentinel.com/news/breaking-news/os-i4-official-groundbreaking-20150217-story.html |access-date = February 18, 2015 |work = Orlando Sentinel }}</ref> After seven years of construction, the express lanes opened to traffic the morning of February 26, 2022, and began tolling on March 3, 2022.<ref>{{cite news |last1 = Spear |first1 = Kevin |title = I-4 Express lanes are expected to open by month's end |url = https://www.orlandosentinel.com/news/transportation/os-ne-i4-toll-lane-open-soon-20220209-srzpvkyil5gj5jdhnra554efpu-story.html |access-date = February 16, 2022 |work = Orlando Sentinel |date = February 9, 2022 }}</ref><ref>{{Cite web |date = February 25, 2022 |title = I-4 Express Opening February 26 |url = https://i4express.com/2022/02/25/i-4-express-opening-february-26/ |access-date = March 17, 2022 |website = I4Express.com |language = en-US |archive-date = March 16, 2022 |archive-url = https://web.archive.org/web/20220316153831/https://i4express.com/2022/02/25/i-4-express-opening-february-26/ |url-status = dead }}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Interstate 4
(section)
Add topic