Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Bluebell Railway
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===West: Horsted Keynes to Haywards Heath via Ardingly=== [[File:3724smallRSBR.JPG|thumb|left|150px|The Ardingly spur, just south of {{stnlnk|Horsted Keynes}}]] [[File:Former Ardingly Branch Line - geograph.org.uk - 859564.jpg|thumb|left|150px|The trackbed just east of the [[Hanson plc|Hanson Aggregates]] depot, {{stnlnk|Ardingly}}]] Originally built as a double-track line,<ref name=Turner3/> it was [[Third rail|electrified]] in the 1930s, with [[SR Class 2NOL|2-NOL]] units used for the [[Seaford railway station, East Sussex|Seaford]]-Horsted Keynes service. The line between Horsted Keynes and Ardingly was operated as single-track in its final years, with [[British Rail Class 401|2-BIL/Class 401]] and [[British Rail Class 402|2-HAL/Class 402]] units. The second track was left in place and used for carriage storage, most notably the new Kent Coast electric stock prior to its introduction and later the steam-hauled stock that it replaced.<ref name=BBExtn/> After the line's closure in 1963, the trackbed was purchased in its entirety by a member of the local gentry. In the 1990s the society bought the abandoned trackbed west between Horsted Keynes and Ardingly from his estate. This included up to the [[Hanson plc|Hanson Aggregates]] depot built on the former [[Ardingly railway station]] site.<ref name=Welch/><ref name=BBExtn/> The society plans to reconnect the line with [[Network Rail]] at Copyhold Junction, to allow access to the [[Brighton Main Line|London to Brighton Main Line]].<ref name=Welch/><ref>{{cite web|access-date=2022-12-28|title=Bluebell Railway ready to advance 'through' railway|url=https://www.railmagazine.com/news/network/2022/09/16/bluebell-railway-ready-to-advance-through-railway|website=www.railmagazine.com}}</ref> Stations could either be located at Copyhold or Haywards Heath. There is a proposal that the line could be restored as [[third rail]] electrified, allowing operation of the society's electric stock.<ref name=BBExtn/> While the {{convert|218|yard|adj=on}} Lywood Tunnel remains in good condition, there are two major areas of work that would be required to re-open the line, these being the replacement of a short girder-bridge span bridge and the {{convert|117|yard|adj=on}} Sheriff Mill Viaduct, which was demolished in 1969. The removed clay-cap from Imberhorne cutting has been deposited on the banks of the former Sherriff Mill viaduct to allow later bridging of the gap.<ref name=BBExtn/> Also in 2013, the former [[Tewkesbury and Malvern Railway]] bridge that crossed over the [[M50 motorway (Great Britain)|M50 motorway]] was donated to the railway for eventual installation in the replacement bridge.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Bluebell Railway
(section)
Add topic