Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Big Dig
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Engineering methods and details === [[File:BigDigSupportsCentralArtery.agr.jpg|thumb|Temporary supports hold up the elevated Central Artery during construction.]] Several unusual engineering challenges arose during the project, requiring unusual solutions and methods to address them. At the beginning of the project, engineers had to figure out the safest way to build the tunnel without endangering the existing elevated highway above. Eventually, they created horizontal braces as wide as the tunnel, then cut away the elevated highway's struts, and lowered it onto the new braces.<ref name="AP 122507">{{Cite news |url=https://news.yahoo.com/s/ap/20071225/ap_on_re_us/big_dig_the_end |archive-url=https://web.archive.org/web/20071228035119/http://news.yahoo.com/s/ap/20071225/ap_on_re_us/big_dig_the_end |archive-date=December 28, 2007 |title=Boston's $14.8B Big Dig finally complete |first=Steve |last=LeBlanc |agency=[[Associated Press]] |date=December 25, 2007}}</ref> Three alternative construction methods were studied with their corresponding structural design to address existing conditions, safety measures, and constructability. In addition to codified loads, construction loads were computed to support final design and field execution.<ref>{{citation |author=Chalhoub Michel Soto |title=Construction Method and Supporting Structural Design for the Boston Area Central Artery Project |date=Aug 1999 |publisher=report#005081999 Integrated Services-CEM Eng Lib}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Big Dig
(section)
Add topic