Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Toronto Transit Commission
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====Future plans==== There is currently one priority TTC expansion plan:<ref>{{cite web|title=Transit expansion in the Greater Toronto Area|url=https://www.ontario.ca/page/transit-expansion-greater-toronto-area|access-date=July 27, 2020|website=Government of Ontario}}</ref> * The Yonge North subway extension is an extension of Line 1 Yonge–University proposed by the government of Ontario, nearly identical to the existing planned Yonge Subway Extension proposed by the City of Toronto, Metrolinx, and York Region. It would extend Line 1 into [[Richmond Hill, Ontario|Richmond Hill]] in [[Regional Municipality of York|York Region]]. The {{Convert|7.4|km||adj=on}} line would travel north from [[Finch station]] to [[Richmond Hill Centre Terminal]] at [[Ontario Highway 7|Highway 7]] and [[Yonge Street]]. The estimated cost for the project is $5.4{{nbsp}}billion, and it is projected to open after the [[Ontario Line]] has been completed.<ref name="Ontario Government Lines Up New Toronto Transit Plan" /><ref>{{cite web|title=Yonge Subway Extension|url=http://www.vivanext.com/project_YongeSubway|access-date=July 22, 2019|website=vivaNext}}</ref> Previous plans called for a second, eastward extension of Line 5 to the [[University of Toronto Scarborough]] campus,<ref>{{Cite web |date=May 28, 2021 |title=Eglinton East Light Rail Transit |url=https://www.toronto.ca/services-payments/streets-parking-transportation/transit-in-toronto/transit-expansion/eglinton-crosstown-and-proposed-extensions/eglinton-east-lrt/ |access-date=August 18, 2022 |website=City of Toronto |language=en-CA}}</ref> though this has since been replaced with plans for a separate [[Eglinton East LRT]] (EELRT), formerly known as the Scarborough Malvern LRT.<ref>{{cite web|url=https://www.toronto.ca/community-people/get-involved/public-consultations/infrastructure-projects/eglinton-east-light-rail-transit/|title=Eglinton East Light Rail Transit|date=May 12, 2023 |publisher=Coty of Toronto|access-date=May 24, 2024}}</ref> Metrolinx is studying an extension of [[Line 4 Sheppard]], to replace the former [[Sheppard East LRT]] project, which would likely connect with the Line 2 Bloor–Danforth extension at McCowan Road and Sheppard Avenue.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Toronto Transit Commission
(section)
Add topic