Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Lucent Technologies
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Mount Olive facility=== The Mount Olive Product Realization Center (MTO-PRC) facility in [[Mount Olive, New Jersey]] was part of the Wireless Networks Group business unit. The 252,000 square-feet building was constructed for [[AT&T Corp.]] in 1994. The two leased buildings were located at the [[International Trade Center (New Jersey)]] and one building was used for warehousing and the other used for wireless products manufacturing<ref name="New Jersey Hills Media Group">{{cite web |title=Lucent hangs up on 170 workers in International Trade Center |url=https://www.newjerseyhills.com/lucent-hangs-up-on-170-workers-in-international-trade-center/article_6c912776-7717-5e92-9a95-9b409b64cb2c.html |website=www.newjerseyhills.com |publisher=New Jersey Hills Media Group |access-date=7 January 2024}}</ref> since 1995. An additionally built wireless products manufacturing, PRC, was located in [[Piscataway, New Jersey]] also independently of AT&T creation.<ref>{{cite web |last1=Pandya |first1=Mukul |title=Lucent Takes to Life After ATT |url=https://njbiz.com/lucent-takes-to-life-after-att/ |website=njbiz.com |publisher=BridgeTower Media |access-date=7 January 2024}}</ref> This [[system integration]] plant was a manufacturing location with the business unit under one roof. This allowed, the development, design, business functions for manufacturing cellular phone parts<ref name="New Jersey Hills Media Group"/> and between 1996 and 1999, the production of first generation CDMA ([[Code-division multiple access]]) minicells needed for cellular phone carriers. A 1,015-lb second generation Flexent Modcell cabinet was introduced in October 1999 for production as [[Personal Communications Service|PCS]] (1.9 gigahertz) and [[Digital AMPS|TDMA]] (time-division multiple access) cellular (850 MHz) versions.<ref name="Industrial Week">{{cite web |last1=Drickhamer |first1=David |date=February 14, 2005 |title=IW Best Plants Profile β 2000 |url=https://www.industryweek.com/talent/article/21939384/iw-best-plants-profile-2000 |website=IndustryWeek |access-date=7 January 2024}}</ref> From 1996 to 1999, PRC achieved and reduced with this new facility the following production metrics and lean manufacturing statistics:<ref name="Industrial Week"/> product-development cycle time reduced over 50%, material cost reduced 43%, cost of goods by 68%, assembly productivity increased close to 150%, assembly defects reduced by 80%, manufacturing inventory reduced 70%, and 100% on-time delivery.<ref>{{cite web |title=North American Manufacturers Honored With Shingo Prize |url=https://www.theautochannel.com/news/press/date/20000501/press014427.html |website=www.theautochannel.com |publisher=The Auto Channel |access-date=7 January 2024}}</ref> The facility introduced several self-managed work teams called PODs (Production On Demand) to assemble and test 50 Flexent Modcells daily.<ref name="Industrial Week"/> The location was also active in research and development of CDMA minicells for future global market growth and third generation [[UMTS|W-CDMA]] (Wideband Code-Division Multiple Access) innovation.<ref>{{cite web |last1=Gregson |first1=Reily |title=LUCENT TECHNOLOGIES TO BUILD JAPAN R&D FACILITY |url=https://www.rcrwireless.com/19971103/archived-articles/lucent-technologies-to-build-japan-r-d-facility |website=www.rcrwireless.com |publisher=RCR Wireless News |access-date=7 January 2024}}</ref> Expansion was evident with minicell lines for the South America market with cross-training technicians from Brazil on the product and the W-CDMA product for Japan's cellular carrier, [[NTT DoCoMo]].<ref name="Industrial Week"/> The facility was awarded various awards and prizes for the [[lean manufacturing]] of products and excellence in work methods.<ref name="Industrial Week"/> In June 2002, Lucent announced closure of the manufacturing building by the end of the year, due to the telecommunication losses in operations. Of the remaining 530 employees at the facility. 170 were employee layoffs and the other 360 employees would mostly transfer to Lucent's [[Whippany, New Jersey]] location. The manufacturing of cell based systems would transfer to the [[Columbus, Ohio]] facility without employees. In the prior year. the warehouse building had closed for consolidation of facilities and cost reduction.<ref name="New Jersey Hills Media Group"/>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Lucent Technologies
(section)
Add topic