Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Space Shuttle Enterprise
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Planned preparations for spaceflight=== At the conclusion of this testing, ''Enterprise'' was due to be taken back to Palmdale for retrofitting as a fully spaceflight capable vehicle. Under this arrangement, ''Enterprise'' would be launched on its maiden spaceflight in July 1981 to launch a communications satellite and retrieve the [[Long Duration Exposure Facility]], then planned for a 1980 release on the first operational orbiter, ''Columbia''. Afterward, ''Enterprise'' would conduct two [[Spacelab]] missions.<ref name="should">{{cite web |url=https://www.wired.com/wiredscience/2012/03/what-shuttle-should-have-been-the-october-1977-flight-manifest |archive-url=https://web.archive.org/web/20120326192250/http://www.wired.com/wiredscience/2012/03/what-shuttle-should-have-been-the-october-1977-flight-manifest |archive-date=March 26, 2012 |title=What Shuttle Should Have Been: The October 1977 Flight Manifest |work=Wired.com |first=David S F |last=Portree |date=March 24, 2012 |access-date=November 7, 2012}}</ref> However, in the period between the rollout of ''Enterprise'' and the rollout of ''Columbia'', a number of significant design changes had taken place, particularly with regard to the weight of the fuselage and wings. This meant that retrofitting the prototype would have been a much more expensive process than previously realized, involving the dismantling of the orbiter and the return of various structural sections to subcontractors across the country. As a consequence, NASA made the decision to convert an incomplete Structural Test Article, numbered STA-099, which had been built to undergo a variety of stress tests, into a fully flight-worthy orbiter, which became {{OV|Challenger|full=no}}. {| class="wikitable" |+ Planned orbital missions<ref name="should" /> |- ! scope="col" style="background:#efefef;" | # ! scope="col" style="width:18%; background:#efefef;"| Date ! scope="col" style="background:#efefef;" | Designation ! scope="col" style="background:#efefef;" | Launch pad ! scope="col" style="background:#efefef;" | Notes |- | 1 | July 16, 1981 | STS-17 | 39-A | Deployment of [[Intelsat]] V satellite and retrieval of [[Long Duration Exposure Facility]] |- | 2 | September 30, 1981 | STS-20 | 39-A | [[Spacelab]] mission |- | 3 | November 25, 1981 | STS-22 | 39-A | [[Spacelab]] mission |}
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Space Shuttle Enterprise
(section)
Add topic