Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Interstate 57
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Future== [[File:Future Interstate 57.jpg|thumb|Sign for then Future I-57 in North Little Rock, Arkansas on March 1, 2018]] I-57 is slated to eventually be extended west along [[U.S. Route 60|US 60]] to [[Poplar Bluff, Missouri]], and then south along the [[U.S. Route 67|US 67]] corridor to [[North Little Rock, Arkansas]], ending at [[Interstate 40|I-40]].<ref name="Extension">{{cite news |last1 = Miller |first1 = Bob |title = Extension of I-57 to impact national traffic, Poplar Bluff and Arkansas economies |url = https://www.semissourian.com/story/2985234.html |access-date = May 18, 2023 |work = Southeast Missourian |date = February 27, 2023 |language = en |archive-date = May 18, 2023 |archive-url = https://web.archive.org/web/20230518190654/https://www.semissourian.com/story/2985234.html |url-status = live }}</ref> The extension is listed under High Priority Corridor 89, the I-57 Corridor Extension.<ref>{{cite web |title = Statutory Listing of Corridor Descriptions |url = https://www.fhwa.dot.gov/planning/national_highway_system/high_priority_corridors/hpcor.cfm |access-date = January 4, 2022 |publisher = [[Federal Highway Administration]] |archive-date = January 10, 2018 |archive-url = https://web.archive.org/web/20180110234312/https://www.fhwa.dot.gov/Planning/national_highway_system/high_priority_corridors/hpcor.cfm |url-status = live }}</ref> In April 2016, a provision designating US 67 from North Little Rock to [[Walnut Ridge, Arkansas]], as "Future I-57" was added into the federal fiscal year 2017 Transportation, Housing and Urban Development funding bill and officially became law in 2017.<ref>{{cite news |author = |title = Arkansas Highway to Receive 'Future I-57' Designation |url = http://www.swtimes.com/news/20170602/arkansas-highway-to-receive-future-i-57-designation |access-date = June 14, 2017 |website = Times Record |agency = Arkansas News Bureau |archive-date = June 2, 2017 |archive-url = https://web.archive.org/web/20170602093233/http://www.swtimes.com/news/20170602/arkansas-highway-to-receive-future-i-57-designation |url-status = dead }}</ref> On November 7, 2024, the section of US 67 between North Little Rock and Walnut Ridge, Arkansas, was officially designated as I-57 by ArDOT.<ref>{{Cite news |date = November 8, 2024 |title = Highway 67 now designated as Interstate 57, will soon connect North Little Rock to Chicago |url = https://www.kark.com/news/state-news/highway-67-now-designated-as-interstate-57-will-soon-connect-north-little-rock-to-chicago/ |access-date = November 13, 2024 |publisher = KARK |language = en-US }}</ref> Missouri has already converted {{convert|62|mi|km}} of the US 60/US 67 corridor between [[Sikeston, Missouri|Sikeston]] and [[U.S. Route 160#Missouri|US 160]]/[[Missouri Route 158|Route 158]] near [[Harviell, Missouri|Harviell]] to a mixture of freeway and expressway segments. All at-grade crossings along the corridor would have to be eliminated before the Interstate designation could be applied.<ref>{{cite news |last1 = Heuring |first1 = Leonna |title = MoDOT Celebrates Completion of US 60 Four-Lane Project with Caravan |url = http://www.semissourian.com/story/1653279.html |work = [[The Southeast Missourian]] |location = Cape Girardeau, Missouri |access-date = April 26, 2016 |date = August 1, 2010 |archive-date = May 12, 2016 |archive-url = https://web.archive.org/web/20160512231510/http://www.semissourian.com/story/1653279.html |url-status = live }}</ref> This leaves about {{convert|12|mi|km|spell=in}} of new freeway between US 160/Route 158 to the Arkansas state line to be constructed.<ref>{{Cite web |title = U.S. 67 (Future I-57) in Butler County: Phase 3 |publisher = Missouri Department of Transportation |url = https://www.modot.org/futureI57/phase3 |access-date = November 13, 2024 }}</ref> In Arkansas, {{convert|118|mi|km}} of Interstate-grade US 67 runs from I-40 to [[U.S. Route 412|US 412]] in Walnut Ridge, leaving a segment of approximately {{convert|40|mi|km}} of new Interstate-grade highway along US 67 that still would need to be built in northeastern Arkansas.<ref>{{cite news |last1 = Reaves |first1 = Jonathan |title = Arkansas 'has a lot of work to do' to bring 'Future I-57' to Missouri line |date = June 2017 |url = http://kasu.org/post/arkansas-has-lot-work-do-bring-future-i-57-missouri-line |publisher = KASU-TV |access-date = June 14, 2017 |archive-date = June 1, 2017 |archive-url = https://web.archive.org/web/20170601214359/http://kasu.org/post/arkansas-has-lot-work-do-bring-future-i-57-missouri-line |url-status = live }}</ref> The [[Arkansas Department of Transportation]] (ArDOT) announced in September 2023 that work to extend Future I-57 in [[Clay County, Arkansas|Clay County]] would begin in late 2024 or early 2025 depending on when contracts are let along with completion of the final design process.<ref>{{cite news |title = I-57 route identified |url = https://www.jonesborosun.com/news/i-57-route-identified/article_591d7d82-0755-5714-bb9a-02fad856cf44.html |access-date = October 26, 2023 |work = Jonesboro Sun |date = October 25, 2023 |language = en |archive-date = October 26, 2023 |archive-url = https://web.archive.org/web/20231026162359/https://www.jonesborosun.com/news/i-57-route-identified/article_591d7d82-0755-5714-bb9a-02fad856cf44.html |url-status = live }}</ref> The first section will be between the US 67 interchanges at Walnut Ridge and [[Corning, Arkansas|Corning]] while the second section (which will begin construction starting in 2025) will extend the first section northward to the Missouri state line.<ref>{{Cite web |last = Arkansas Department of Transportation |date = October 25, 2023 |title = Future Interstate 57 Alignment from Walnut Ridge to Missouri State Line Chosen |url = https://www.ardot.gov/news/23-365/ |access-date = November 13, 2024 |publisher = Arkansas Department of Transportation }}</ref> Plans for the Corning Bypass show '''Arkansas Highway 657''' ('''AR 657''') as a temporary designation for this section until other sections are completed.<ref>{{cite web |title=Corning Bypass (Future I-57) |url=https://www.ardot.gov/wp-content/uploads/101172_1-plans.pdf#page=191 |publisher=Arkansas Department of Transportation |author=((District 10)) |access-date=November 25, 2024}}</ref> ARDOT broke ground on November 14, 2024 on the Corning Bypass.<ref name=":0">{{cite news |title=ARDOT to Break Ground on Corning Bypass |url=https://www.ardot.gov/news/24-341/ |access-date=November 25, 2024 |publisher=Arkansas Department of Transportation |date=November 6, 2024}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Interstate 57
(section)
Add topic