Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Channel Tunnel
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Construction === [[File:A déli pajzs a keresztezőkamrában.jpg|thumb|One of the southern tunnel boring machines]] Working from both the English and French sides of the Channel, eleven [[tunnel boring machine]]s (TBMs) cut through chalk [[marl]] to construct two rail tunnels and a service tunnel. The vehicle shuttle terminals are at [[Cheriton, Kent|Cheriton]] (part of [[Folkestone]]) and Coquelles, and are connected to the English [[M20 motorway|M20]] and French [[A16 motorway (France)|A16]] motorways respectively. Tunnelling commenced in 1988, and the tunnel began operating in 1994.<ref name="BBConthisday">{{cite news |url=http://news.bbc.co.uk/onthisday/hi/dates/stories/december/1/newsid_2516000/2516473.stm |title=On this day: Tunnel links UK and Europe |work=BBC News |access-date=19 July 2009 |date=1 December 1990}}</ref> At the peak of construction 15,000 people were employed with daily expenditure over £3 million.<ref name="Anderson Story p xvi-xvii">Anderson, pp. xvi–xvii</ref> Ten workers, eight of them British, were killed during construction between 1987 and 1993, most in the first few months of boring.<ref name="Harlow">{{cite news |first=John |last=Harlow |title=Phantom Trains Wreak Havoc in Channel Tunnel |work=The Times |location=UK |date=2 April 1995}}</ref><ref name="ingenious 1">{{cite web |url=http://www.ingenious.org.uk/Read/Identity/RailwaysandIdentity/Navvies/ |title=Navvies |date=11 March 2008 |publisher=ingenious |access-date=19 July 2009 |url-status=dead |archive-url=https://web.archive.org/web/20090727195547/http://www.ingenious.org.uk/Read/Identity/RailwaysandIdentity/Navvies/ |archive-date=27 July 2009 }}</ref><ref>{{cite news |url=https://www.independent.co.uk/news/world/europe/thirteen-workers-die-as-safety-standards-are-ignored-in-race-to-build-olympic-sites-558698.html |archive-url=https://web.archive.org/web/20081204174908/http://www.independent.co.uk/news/world/europe/thirteen-workers-die-as-safety-standards-are-ignored-in-race-to-build-olympic-sites-558698.html |url-status=dead |archive-date=4 December 2008 |title=Thirteen workers die as safety standards are ignored in race to build Olympic sites |work=The Independent |location=UK |access-date=26 September 2008 |date=3 April 2004}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Channel Tunnel
(section)
Add topic