Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Shinkansen
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Mini-Shinkansen === {{Nihongo|Mini-shinkansen|γγζ°εΉΉη·}} is the name given to the routes where former narrow-gauge lines have been converted to standard gauge to allow Shinkansen trains to travel to cities without the expense of constructing full Shinkansen standard lines. Two mini-shinkansen routes have been constructed: the [[Yamagata Shinkansen]] and [[Akita Shinkansen]]. Shinkansen services to these lines traverse the [[Tohoku Shinkansen]] line from Tokyo before branching off to traditional main lines. On both the Yamagata/Shinjo and Akita lines, the narrow-gauge lines were regauged, resulting in the local services being operated by [[701-5000 series|standard-gauge versions]] of {{Track gauge|1,067mm}} suburban/interurban rolling stock. On the Akita line between Omagari and Akita, one of the two narrow-gauge lines was regauged, and a section of the remaining narrow-gauge line is dual gauge, providing opportunity for Shinkansen services to pass each other without stopping. The maximum speed on these lines is {{convert|130|km/h|mph|abbr=on}}, however the overall travel time to/from Tokyo is improved due to the elimination of the need for passengers to change trains at [[Fukushima, Fukushima|Fukushima]] and [[Morioka, Iwate|Morioka]] respectively. As the [[Loading gauge]] (size of the train that can travel on a line) was not altered when the rail gauge was widened, only Shinkansen trains specially built for these routes can travel on the lines. They are the E3 and E6 series trains. Whilst no further Mini-shinkansen routes have been proposed, it remains an option for providing Shinkansen services to cities on the narrow-gauge network.{{Citation needed|date=May 2025}} ====Proposed Ou Base Tunnel==== Construction of a [[Base tunnel]] on the [[Yamagata Shinkansen]] is proposed, with JR East having undertaken a survey of a planned route from Niwasaka to Sekine, just south of Yonezawa station.<ref>{{Cite web |date=7 November 2022 |title=Yamagata mini-Shinkansen base tunnel proposal makes progress |url=https://www.railwaygazette.com/infrastructure/yamagata-mini-shinkansen-base-tunnel-proposal-makes-progress/62884.article |url-access=subscription |access-date=12 November 2022 |website=Railway Gazette International }}</ref> {{convert|23.1|km|mi|abbr=on}} of the proposed {{convert|24.9|km|mi|abbr=on}} line would be in tunnel, mostly to the north of the existing {{convert|88|km|mi|abbr=on}} Fukushima β Yamagata section. To be built on an improved alignment, the tunnel would lower journey times between Fukushima and Yamagata by ~10 min due to a proposed line speed of up to 200 km/h. The tunnel would avoid the Itaya Toge pass through the Ou mountains west of Fukushima. Gradients range from 3.0% to 3.8% and the line reaches an altitude of {{convert|548|m|ft|abbr=on}}. The curvature and steep grades limit train speeds to {{convert|55|km/h|mph|abbr=on}} or less, and the line is vulnerable to heavy rain and snowfall as well as high winds. Between 2011 and 2017 a total of 410 Yamagata mini-Shinkansen services were either suspended or delayed, and 40% of these incidents occurred on the line over the Itaya Toge pass. If the {{Yen|150 billion}} base tunnel is authorised, detailed design would take five years and construction another 15 years. The cost could increase by {{Yen|12 billion}} if the tunnel were to be built with a cross-section large enough to permit the line to be upgraded to the full Shinkansen loading gauge.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Shinkansen
(section)
Add topic