Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Montana-class battleship
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Construction and cancellation== [[File:USS Montana line drawing.svg|thumb|upright=2.5|Line drawing of a ''Montana''-class battleship]] The General Board planned to build four ships to the new design, which would have constituted a single battleship [[division (naval)|division]], but five were authorized by the Two-Ocean Navy Act on 19 July 1940. Work was intended to begin later that year, but shortages of the necessary steel caused delays. Work on the new locks for the Panama Canal was also halted in 1941, also owing to a shortage of steel due to the changing strategic and material priorities.{{sfn|Friedman|1980|p=100}}{{sfn|Friedman|1985|p=342}} The final contract design was issued in June 1942. Construction was authorized by the United States Congress and the projected date of completion was estimated to be somewhere between 1 July and 1 November 1945.{{sfn|Garzke|Dulin|1995|p=164}} In October 1942, work on the ships was again delayed by the order of some eighty destroyers, which were badly needed for the [[Battle of the Atlantic]] against German [[U-boat]]s that were raiding the supply [[convoy]]s to Britain.{{sfn|Friedman|1980|p=89}} Additional work on the design continued into 1942, including detail work on the anti-aircraft batteries to be carried. The [[Bureau of Ships]] suggested the armor decks could be increased in thickness, but these changes were not pursued.{{sfn|Friedman|1985|p=342}} All five ships were ultimately cancelled on 21 July 1943, as production priorities had shifted decisively toward aircraft carriers, destroyers, and [[submarine]]s.{{sfn|Friedman|1980|pp=89, 100}} The time spent refining the ''Montana'' design was not entirely a waste, as the arrangement of the propulsion system was modified for the {{sclass|Midway|aircraft carrier|1}}s.{{sfn|Friedman|1980|p=100}}
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Montana-class battleship
(section)
Add topic