Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Great Belt Bridge
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== East Tunnel === The twin bored tunnel tubes of the East Tunnel (''Østtunnelen'') are each {{convert|8024|m|mi|sigfig=4|abbr=in}} long.<ref name="fakta" /> There are 31 connecting tunnels between the two main tunnels, at {{convert|250|m|ft|0}} intervals. The equipment that is necessary for train operation in the tunnels{{Clarify|date=January 2010}} is installed in the connecting tunnels, which also serve as emergency escape routes. There were delays and cost overruns in the tunnel construction. The plan was to open it in 1993, giving the trains a head start of three years over road traffic, but train traffic started in 1997 and road traffic in 1998. During construction the sea bed gave way and one of the tunnels was flooded. The water continued to rise and reached the end at Sprogø, where it continued into the (still dry) other tunnel. The water damaged two of the four [[tunnel boring machine]]s, but no workers were injured. Only by placing a clay blanket on the sea bed was it possible to dry out the tunnels. The two damaged machines were repaired and the majority of the tunnelling was undertaken from the Sprogø side. The machines on the Zealand side tunnelled through difficult ground and made little progress. A major fire on one of the Zealand machines in June 1994 stopped these drives and the tunnels were completed by the two Sprogø machines. A total of 320 [[Breathing gas|compressed air]] workers were involved in 9,018 pressure exposures in the four tunnel-boring machines.<ref name="pmid12670120">{{cite journal |author=Andersen, H. L. |title=Decompression sickness during construction of the Great Belt Tunnel, Denmark |journal=[[Undersea and Hyperbaric Medicine Journal]] |volume=29 |issue=3 |pages=172–88 |year=2002 |pmid=12670120 |url=http://archive.rubicon-foundation.org/3909 |access-date=2010-11-14 |archive-date=2 September 2012 |archive-url=https://web.archive.org/web/20120902162438/http://archive.rubicon-foundation.org/xmlui/handle/123456789/3909 |url-status=usurped }}</ref> The project had a [[decompression sickness]] incidence of 0.14% with two workers having long-term residual symptoms.<ref name="pmid12670120" />
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Great Belt Bridge
(section)
Add topic