Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
West Palm Beach, Florida
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===West Palm Beach Canal (C51)=== According to the [[U.S. Army Corps of Engineers]], the West Palm Beach Canal (C-51)/Stormwater Treatment Area (STA)1 East project was authorized by the [[U.S. Congress]] under the Flood Control Acts of 1948, 1954, 1962, 1968, and the [[Water Resources Development Act]] (WRDA) of 1996. The project is located in [[Palm Beach County]] and runs east to west from [[West Palm Beach]] at Lake Worth to Water Conservation Area (WCA) No. 1 ([[Loxahatchee National Wildlife Refuge]]). The authorized project will provide 30-year flood protection to the urbanized eastern basin and 10-year flood protection to the western basin. All eastern basin features have been completed.<ref name="CESAJ-PM(Cong)">{{cite web|url= https://www.saj.usace.army.mil/Portals/44/docs/CongressionalFS/2015/CSF_West_Palm_Beach_Canal_%28C51%29_%28C%29_CFS15.pdf |title= Congressional Fact Sheet - West Palm Beach Canal (C51) |date=March 2015 |website=U.S. Army Corps of Engineers |access-date=19 February 2020}}</ref> During mediation of the Everglades water quality litigation, a technical plan was developed for resolution of the litigation. The technical plan included a substantially modified C-51 project. The modified plan expands the original 1,600-acre floodwater detention area into a 6,500-acre stormwater detention area. In addition to the flood damage reduction benefits provided by the original project, the modified plan provides [[water treatment]], reduction of damaging freshwater [[discharge (hydrology)|discharges]] to [[Lake Worth Lagoon|Lake Worth]], and increased [[water supply]] for the [[Everglades]] and other users.<ref name="CESAJ-PM(Cong)"/> According to the U.S. Army Corps of Engineers, the total estimated cost of the West Palm Beach Canal (C51) is $375.47 million, with an estimated $345.04 million as the Federal Government's cost share. A total of $1.05 million was appropriated for this project by the U.S. Congress in Fiscal Year 2015. The Fiscal Year 2016 Budget Request from the [[U.S. President]] to the U.S. Congress was for $1 million.<ref name="CESAJ-PM(Cong)"/>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
West Palm Beach, Florida
(section)
Add topic