Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Underground hard-rock mining
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Development mining vs. production mining== There are two principal phases of underground mining: development mining and production mining. Development mining is composed of excavation almost entirely in (non-valuable) waste rock in order to gain access to the orebody. There are six steps in development mining: remove previously blasted material (muck out round), scaling (removing any unstable slabs of rock hanging from the roof and sidewalls to protect workers and equipment from damage), installing support or/and reinforcement using [[shotcrete]] or other supports, drill face rock, load explosives, and blast explosives. To start the mining, the first step is to make the path to go down. The path is defined as 'Decline' as describe above. Before the start of a decline, all pre-planning of the power facility, drilling arrangement, de-watering, ventilation and, muck withdrawal facilities are required.<ref>{{Cite web |last=Brazil |first=M. |title=Decline design in underground mines using constrained path optimisation |url=https://www.math.uwaterloo.ca/~nwormald/papers/DOT2.pdf |url-status=deviated |archive-url=https://web.archive.org/web/20101124001917/https://www.math.uwaterloo.ca/~nwormald/papers/DOT2.pdf |archive-date=2010-11-24 |access-date=19 Jun 2023 |website=math.uwaterloo.ca}}</ref> Production mining is further broken down into two methods, long hole and short hole. Short hole mining is similar to development mining, except that it occurs in ore. There are several different methods of long hole mining. Typically, long hole mining requires two excavations within the ore at different elevations below surface, (15 m β 30 m apart). Holes are drilled between the two excavations and loaded with explosives. The holes are blasted and the ore is removed from the bottom excavation.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Underground hard-rock mining
(section)
Add topic