Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Transport in Romania
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Motorways=== {{main|Highways in Romania}} Motorways are identified by A followed by a number. As of December 2024, Romania has 1,217.77 km of highway completed with more under planning or construction. In recent years, a master plan for the national motorway network has been developed and approved by the European Commission in July 2015. Currently the [[A1 motorway (Romania)|A1 motorway]], part of the northern branch of the Pan European IV Corridor, is open on 456 km. Under construction are the segments [[Curtea de Argeș]]—[[Pitești]] (30 km). [[Margina]]—[[Holdea]] (13 km) and [[Boița]]—[[Curtea de Argeș]] (73 km) have yet to start construction. It has a total length of 576 km. The [[A2 motorway (Romania)|A2 motorway]] was the first motorway in Romania opened on all its segments, with a length of 205 km. It links Bucharest to [[Constanța]] (junction with A4) The [[A3 motorway (Romania)|A3 motorway]], which is the largest motorway project in Eastern Europe with a length of 588 km from [[Bucharest]] to [[Oradea]] (near the Hungarian border), is open on 173 km. The segment [[Chețani]]—[[Câmpia Turzii]] (15.7 km) is under construction. All segments between [[Nădășelu]] and Oradea have been tendered by the end of 2020. The remaining sections are still in the planned phase. The [[A4 motorway (Romania)|A4 motorway]] is operational on 22 km, from [[Ovidiu]] to [[Agigea]] (also known as the [[Constanța]] bypass). Another 45 km are planned, from Agigea to [[Vama Veche]] (at the border with [[Bulgaria]]). The [[A6 motorway (Romania)|A6 motorway]] is also part of the Pan European IV Corridor, but near [[Lugoj]] it starts as the southern branch, that connects the cities of [[Sofia]], [[Istanbul]] and [[Athens]]. It has a length of 270 km, of which 11.4 km between A1 and Lugoj bypass are open. The [[A7 motorway (Romania)|A7 motorway]] starts from the A3 (near [[Ploiești]]), linking it to the region of Moldavia and further to the Ukrainian border. From its planned 450 km, 16 km are open near [[Bacău]], which serve as the bypass for that city. The [[A10 motorway (Romania)|A10 motorway]] is the first motorway which links two motorways in Romania: A1 (near [[Sebeș]]) and A3 (near [[Turda]]). It has 70 km, and since 2021, it has been operational on its entire length. The [[A11 motorway (Romania)|A11 motorway]] is a 135 km motorway, the second to connect A1 with A3 this time between [[Arad, Romania|Arad]] and Oradea, of which a 2.4 km stretch near Arad called the Arad bypass is open.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Transport in Romania
(section)
Add topic