Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Kingsway Tunnel
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Operations== Kingsway comprises identical twin tunnels. Each has two {{convert|12|ft|m|abbr=on}} lanes. They carry on average 45,000 vehicles a day (almost 16.4 million per year).<ref>{{cite web|url=http://www.merseygateway.co.uk/publicinquirydocs/Core-docs/CD-203.pdf|title= Mersey Crossing Study β The Mersey Gateway Project|publisher=Mersey Gateway|access-date=29 September 2014}}</ref> {{As of|May 2024}}, a single car journey through the tunnel cost Β£2.10.<ref name="toll">{{cite web|url= https://www.merseytravel.gov.uk/tunnels/tolls-fees-and-charges/ |title=Tolls, Fees and Charges|work=Mersey Tunnels|access-date=1 May 2024}}</ref> Staffed and automatic tollbooths are located on the Wallasey side. Of the two tunnels crossing the River Mersey, Kingsway is the only one able to take [[large goods vehicle|heavy goods vehicles]] (HGVs). In a study following the [[Mont Blanc tunnel fire|fire in the Mont Blanc Tunnel]] in 1999, inspectors from the [[European Union]] rated the Kingsway Tunnel as "good", one of fourteen to receive that rating in Europe.<ref>{{cite web|url=https://www.theaa.com/public_affairs/reports/tunnel_tests_2005.pdf|title=The European Tunnel Assessment Programme (EUROTAP) 2005 Inspections |publisher=The AA|access-date=29 September 2014}}</ref> Over {{convert|75|mi|-1}} of wiring was installed in the tunnel as part of a 2016 upgrade to the lighting, which saw the tunnel fitted with more energy efficient and longer-lasting LED lights.<ref>{{cite web|title=Major Kingsway Tunnel rewire begins|url=http://www.merseytravel.gov.uk/about-us/media-centre/news/Pages/Major-Kingsway-Tunnel-rewire-begins.aspx|website=merseytravel.gov.uk|access-date=22 December 2017|language=en}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Kingsway Tunnel
(section)
Add topic