Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Stockholm
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==== The City Line Project ==== {{Main|Stockholm City Line}} With an estimated cost of SEK 16.8 billion (January 2007 price level), which equals 2.44 billion US dollars, the [[Stockholm City Line|City Line]], an environmentally certified project, comprises a {{convert|6|km|abbr=on}}-long commuter train tunnel (in rock and water) beneath Stockholm, with two new stations (Stockholm City and Stockholm Odenplan), and a {{convert|1.4|km|abbr=on}}-long railway bridge at [[Enskede-Årsta|Årsta]]. The City Line was built by the Swedish Transport Administration in co-operation with the City of Stockholm, Stockholm County Council, and Stockholm Transport, SL. As [[Stockholm Central Station]] is overloaded, the purpose of this project was to double the city's track capacity and improve service efficiency. Operations began in July 2017.<ref name="trafikverket1">{{Cite web |title=The Stockholm City Line |url=http://www.trafikverket.se/en/startpage/projects/Railway-construction-projects/The-Stockholm-City-Line/ |access-date=28 July 2017 |publisher=[[Swedish Transport Administration]] |archive-date=30 July 2017 |archive-url=https://web.archive.org/web/20170730015258/http://www.trafikverket.se/en/startpage/projects/Railway-construction-projects/The-Stockholm-City-Line |url-status=live }}</ref><ref>{{Cite magazine |last=Barrow |first=Keith |date=10 July 2017 |title=Stockholm City Line opens |url=http://www.railjournal.com/index.php/commuter-rail/stockholm-city-line-opens.html |magazine=[[International Railway Journal]] |access-date=28 July 2017 |archive-date=28 July 2017 |archive-url=https://web.archive.org/web/20170728213510/http://www.railjournal.com/index.php/commuter-rail/stockholm-city-line-opens.html |url-status=live }}</ref> Between [[Riddarholmen]] and Söder Mälarstrand, the City Line runs through a submerged concrete tunnel.<ref name="trafikverket1" /> As a green project, the City Line includes the purification of waste water; noise reduction through sound-attenuating tracks; the use of synthetic diesel, which provides users with clean air; and the recycling of excavated rocks.<ref name="trafikverket1" />
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Stockholm
(section)
Add topic