Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Transport in Uganda
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Railways == {{Main|Uganda Railways Corporation}} {{See also|Railway stations in Uganda}} As of 2017, Uganda's railway network measures about {{convert|1250|km|0}} in length. Of this, about 56% ({{convert|700|km|0}}), is operational. All existing railway is metre gauge. A new standard gauge rail network is planned. [[File:Uganda railroad2006.jpg|thumb|Uganda Railway ]] A railroad originating at [[Mombasa]] on the [[Indian Ocean]] connects with [[Tororo]], where it branches westward to [[Jinja, Uganda|Jinja]], Kampala, and [[Kasese]] and northward to [[Mbale]], [[Soroti]], Lira, [[Gulu]], and [[Pakwach]]. The only railway line still operating, however, is the [[Malaba, Uganda|Malaba]]β[[Kampala]] line.<ref name="1R" /> ===Railway links with neighboring countries=== * {{flagicon|Kenya}} [[Transport in Kenya|Kenya]]: Yes; same gauge {{RailGauge|1000mm}} * {{flagicon|South Sudan}} [[Transport in South Sudan|South Sudan]]: Proposed; [[break of gauge]] {{RailGauge|1000mm}}/{{RailGauge|1067mm}} * {{flagicon|Democratic Republic of the Congo}} [[Transport in the Democratic Republic of the Congo|Democratic Republic of the Congo]]: No; [[break of gauge]] {{RailGauge|1000mm}}/{{RailGauge|1067mm}} * {{flagicon|Rwanda}} [[Transport in Rwanda|Rwanda]]: No; Does not yet have railways * {{flagicon|Tanzania}} [[Transport in Tanzania|Tanzania]]: No direct connection except via [[train ferry]]; same gauge {{RailGauge|1000mm}} === Couplings and brakes === * [[Railway coupling|Couplings]] : [[Railway coupling#Norwegian|Meatchopper (Norwegian)]] * [[Railway brake|Brakes]] : [[Railway airbrake|Air]]<ref name="6R">{{cite web|title=Metre-Gauge Beyer-Garratt 4-8-4 + 4-8-4 for the Kenya & Uganda Railways |access-date=9 June 2018 | url=http://www.garrattmaker.com/history.html |date=21 July 1939 | publisher=Garrattmaker.com Quoting The Railway Gazette | author=The Railway Gazette}}</ref> * Standards <ref name=SGR>{{cite web|title=Specifications & Standards|access-date=22 June 2020| url=https://www.sgr.go.ug/specifications}}</ref> ===Plans=== ====Standard Gauge Railway==== {{main|Uganda Standard Gauge Railway}} The six countries of the [[East African Community]] are in the process of constructing railway lines with {{Track gauge|1435mm}} [[Standard-gauge railway|standard gauge]] tracks. Kenya had, by June 2018, completed the construction of the [[Mombasa]]β[[Nairobi]] section of its Standard Gauge Railway (SGR), which cost US$4.47 billion (original budget was US$3.2 billion), borrowed from the [[Exim Bank of China]].<ref name="7R">{{cite web|url=https://www.bbc.com/news/world-africa-40171095 |title=Will Kenya get value for money from its new railway? |publisher=[[British Broadcasting Corporation|BBC Africa]] |first=Nancy |last=Kacungira |location=Nairobi| date=8 June 2017 |access-date=10 June 2018}}</ref><ref name="8R">{{cite magazine|url=http://www.newsweek.com/kenya-railway-china-madaraka-express-618357 |title=Kenya Just Opened A $4 Billion Chinese-Built Railway, Its Largest Infrastructure Project In 50 Years |date=31 May 2017 |access-date=10 June 2018 |first=Conor |last=Gaffey |magazine=[[Newsweek]] |location=New York City}}</ref> The country now plans to extend he SGR line to [[Nakuru]], [[Kisumu]] and [[Malaba, Kenya|Malaba]], when funds become available.<ref name="9R">{{cite web|access-date=10 June 2018 | url=https://www.businessdailyafrica.com/news/Proposed-link-to-Nakuru-could-push-up-costs-of-SGR/539546-2986224-is89f4/index.html |title=Proposed link to Nakuru could push up costs of SGR |date=6 December 2015 |newspaper=[[Business Daily Africa]] |first=Lynet |last=Igadwah |location=Nairobi}}</ref> [[File:Mombasa - Nairobi metre gauge railway outside Voi.jpg|thumb|Mombasa-Nairobi metre gauge Railway outside]] Uganda plans to construct a total of four SGR lines, totaling {{convert|1547|km|0}}, at an estimated cost of US$12.6 billion.<ref name="10R">{{cite web|access-date=10 June 2018 | url=http://www.monitor.co.ug/News/National/Minister--Shs45-6-trillion--railway--project-cost-Kenya/688334-3880840-fwx8nl/index.html |date=7 April 2017 |newspaper=[[Daily Monitor]] |first=Nelson |last=Wesonga |location=Kampala |title=Minister defends Shs45.6 trillion Standard Gauge Railway project cost}}</ref><ref name="11R">{{cite web|access-date=10 June 2018 | url=https://qz.com/1036970/ugandas-chinese-built-sgr-railway-will-cost-more-than-kenyas/|title=Uganda's Chinese-built high speed railway will cost even more than Kenya's did |last=Kuo |date=24 July 2017 |first=Lily |publisher=Quartz Africa}}</ref> Uganda's SGR is planned to link it to four neighboring countries, including [[Kenya]], [[Rwanda]], [[DR Congo]] and [[South Sudan]].<ref name="12R">{{cite web|access-date=10 June 2018 | url=https://constructionreviewonline.com/2015/04/us3-2bn-standard-gauge-railway-line-to-connect-uganda-and-s-sudan/ | date=10 September 2015 |publisher=Construction Review Online | title=US$3.2bn Standard Gauge Railway line to connect Uganda and South Sudan |author=Bonface |location=Nairobi}}</ref> ====The Rift Valley Consortium==== {{main|Rift Valley Railways Consortium}} Between 2006 and 2017, a company known as [[Rift Valley Railways Consortium|Rift Valley Railways]] (RVRC) managed the [[Kenya Railways Corporation]]'s and the [[Uganda Railways Corporation]]'s {{cvt|1000|mm|ftin|frac=8}} [[metre gauge]] railway systems, under a 25-year concession.<ref name="13R">{{cite web|access-date=10 June 2018 |url=http://allafrica.com/stories/200607280144.html | title=East Africa: Kenya And Uganda Railways Takeover Date Postponed |date=28 July 2006 |newspaper=[[The Standard (Kenya)]] via [[AllAfrica.com]] |first=Kimathi |last=Njoka | location=Nairobi}}</ref><ref name="14R">{{cite web|date=28 July 2006 |url=http://allafrica.com/stories/200607280341.html | title=Kenya: Railway Takeover Pushed to November |access-date=10 June 2018 | newspaper=[[Daily Nation]] via [[AllAfrica.com]] | first=Zeddy |last=Sambu |location=Nairobi}}</ref> [[File:RVR 9409 Nairobi.jpg|thumb|Rift Valley Railway Nairobi]] In August 2017, the [[government of Kenya]] terminated the RVRC concession, citing failure by RVRC to perform as stipulated in the concession agreement.<ref name="15R">{{cite web| access-date=10 June 2018 |date=1 August 2017 |location=Nairobi |url=https://www.theeastafrican.co.ke/business/Kenya-ends-Rift-Valley-Railways-contract/2560-4040424-lofuc0z/index.html | title=Kenya ends Rift Valley Railways contract |first=Njiraini |last=Muchira |newspaper=[[The EastAfrican]]}}</ref> In October 2017, Uganda followed suit,<ref name="16R">{{cite web| title=Government cancels Rift Valley Railways deal | url=http://www.monitor.co.ug/News/National/Government-cancels-Rift-Valley-Railways-deal/688334-4129752-144xd01/index.html | access-date=10 June 2018 |date=8 October 2017 |last=Frederic Musisi |first=and Thembo Kahungu | newspaper=[[Daily Monitor]] | location=Kampala}}</ref> but RVRC ran to court to stop the termination.<ref name="17R">{{cite web| url=http://www.monitor.co.ug/Business/Markets/Uganda--Kenya-failed-railway-deal---RVR-chief/688606-4140902-15aa6p0/index.html |title=Uganda, Kenya failed railway deal - RVR Chief | access-date=10 June 2018 |date=12 February 2018 | newspaper=[[Daily Monitor]] |first=Fredric |last=Musisi | location=Kampala}}</ref><ref name="18R">{{cite web| date=12 February 2018 |access-date=10 June 2018 | url=http://www.monitor.co.ug/Business/Govt-RVR-fresh-legal-battle-railway-deal/688322-4300740-poougjz/index.html | title=Government, RVR in fresh legal battle over railway deal | newspaper=[[Daily Monitor]] |first=Fredric |last=Musisi | location=Kampala}}</ref> In February 2018, Uganda Railways Corporation finally took possession of the concession assets and resumed operating the metre-gauge railway system in Uganda.<ref name="19R">{{cite web|access-date=10 June 2018 | url=http://www.monitor.co.ug/News/National/Passenger-train-services-resume-Monday/688334-4316028-5l40lxz/index.html |title=Passenger train services to resume on Monday | first=Amos |last=Ngwomwoya |date=23 February 2018 | newspaper=[[Daily Monitor]] |location=Kampala}}</ref><ref name="20R">{{cite web|access-date=10 June 2018 |location=Kampala |url=http://observer.ug/news/headlines/57044-ugandans-welcome-revamped-passenger-train-services.html |title=Kampalans welcome revamped passenger train services |date=27 February 2018 | first=and Mercy Ahukana |last=Alfred Ochwo |newspaper=[[The Observer (Uganda)]]}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Transport in Uganda
(section)
Add topic