Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Elbląg
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Port of Elbląg == Elbląg is not a deep-water port. The draft of vessels using its waterways must be no greater than {{convert|1.5|m|2|abbr=on}} by law. The turning area at Elbląg is {{convert|120|m|2|abbr=on}} diameter and a pilot is required for large vessels.<ref>[http://www.polfracht.pl/polfracht/psal/localinf/elb/portelb1.htm Port Elbląg] {{webarchive|url=https://web.archive.org/web/20060805113641/http://www.polfracht.pl/polfracht/psal/localinf/elb/portelb1.htm |date=August 5, 2006 }}, site maintained by Polfracht Shipping Agency Ltd.</ref> Deep water vessels cannot manoeuvre; in that sense, Elbląg has become a subsidiary [[port of Gdańsk]]. Traffic of smaller vessels at Elbląg is within the river and very marginal, while larger vessels were unable to reach the open [[Baltic Sea]] after 1945 without crossing into [[Russia]]n territory. Construction of the [[Vistula Spit canal]] was completed in September 2022, allowing vessels access to the Baltic Sea while remaining within Polish territory.<ref>{{cite web| url = https://polishnews.co.uk/the-vistula-spit-the-dredging-of-the-shipping-canal-has-begun-the-first-units-are-to-sail-in-2022/ |title=The Vistula Spit. The dredging of the shipping canal has begun. The first units are to sail in 2022 |date=August 3, 2021 | access-date = 12 March 2022}}</ref><ref>{{cite web| url = https://www.ndi.pl/en/vistula-spit-june-report |title=Vistula Spit – june report | access-date = 12 March 2022}}</ref> The city features three quay complexes, movable cranes, and railways.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Elbląg
(section)
Add topic