Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Dartmouth Dam
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Power station damage=== On 2 May 1990, the 180 MW Francis turbine-generator running at full speed was instantaneously stopped by a foreign body left in the penstock following maintenance.<ref>SECV, "Report of Investigation into the cause of damage of Dartmouth Power Station on 2 May 1990", State Electricity Commission of Victoria, Power Grid and Distribution Department Publications, June 1990</ref> The installation shifted about 2 m within the base of the {{Convert|180|m|ft|-high|adj=mid}} earth and rock fill gravity dam wall of the 3,906 GL reservoir. After initial consternation regarding the integrity of the wall, declared safe after lengthy assessment), the hydro installation was repaired/replaced, but was off-line for several years. A breach of the wall would have obliterated a couple of small towns and a sparsely settled agricultural area in the relatively narrow 120 km Mitta Mitta valley below the dam. More significantly, it would have resulted in the over-topping and probable failure of the earthen walls of the {{Convert|40|m|ft|-high|adj=mid}}, 3,038 GL [[Hume Dam|Lake Hume]], 200 km downstream on the Murray River. This is immediately upstream of the regional cities of [[Albury]] and [[Wodonga]], and a much more intensively settled irrigation area, and consequences would have been disastrous. In May 1990, the turbine casing and concrete machine block surrounding the power station were destroyed, when two steel beams entered the turbine. The resulting force ruined the power station and the dam's control systems, making it impossible to gradually release water from the near-capacity dam by conventional means. An improvised system, placing large pipes over the spillway to siphon water over it, was soon installed. The inflow from an unusually wet spring meant that the dam would have overflowed anyway, leading to a spectacular cascade over the huge rock steps, formed when the rock used for the dam was quarried from the valley walls. The station was re-built and recommissioned in 1993.<ref>{{cite web|title=Newsletter of Engineering Heritage |url=http://www.engineersaustralia.org.au/sites/default/files/shado/Learned%20Groups/Interest%20Groups/Engineering%20Heritage/EHA%20No_%2017%20Nov05_1.pdf |publisher=The Institution of Engineers, Australia |access-date=8 February 2012 |date=November 2005 |archive-url=https://web.archive.org/web/20140303002952/https://www.engineersaustralia.org.au/sites/default/files/shado/Learned%20Groups/Interest%20Groups/Engineering%20Heritage/EHA%20No_%2017%20Nov05_1.pdf |archive-date=2014-03-03}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Dartmouth Dam
(section)
Add topic