Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Øresund Bridge
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Design competition and procurement=== At the end of 1992, the Øresundsbro Konsortiet launched a competition for the design of the link.<ref>{{cite web| url=https://www.researchgate.net/publication/292753348| title=The Øresund bridge completion| access-date=14 March 2025}}</ref> Six entries were submitted, including one designed by [[Santiago Calatrava]] and another by [[Norman Foster, Baron Foster of Thames Bank|Norman Foster]], but two others were selected for further development and procurement. The ASO Group (formed by [[Arup Group]]), with Georg Rotne as architect, proposed that the bridge itself be made mainly of steel in two levels, with highway on top and train traffic below.<ref>{{cite web| url=https://www.arup.com/projects/oresund-link/| title=Designing the Øresund Bridge| publisher=Arup| access-date=14 March 2025}}</ref> ØLC (Øresund Link Consultants) instead placed highway and rail in the same plane on a concrete bridge. Both groups advocated an inclined cable-stayed bridge over the Flintrännan. The procurement of the entire Øresund Link was divided into different contracts, including one contract for the two access bridges and another for the main span. In November 1995, Sundlink Contractors (a consortium of [[Skanska]], [[Hochtief]], [[MT Højgaard|Højgaard & Schultz]] and [[MT Højgaard|Monberg & Thorsen]]) was able to sign a contract with the Øresundsbro Konsortiet to build both the access bridges and the main span in accordance with the ASO Group's proposal, at a cost of DKK 6.8 billion (including a viaduct at Peberholm).<ref name=crossing>{{cite web| url=https://data.oresundsbron.com/cms/download/Crossing%20the%20%C3%98resund.pdf| title= Crossing the Øresund | publisher= Øresundsbron | access-date=16 April 2025}}</ref><ref>{{cite web| url=https://group.skanska.com/sv/media/pressmeddelanden-och-artiklar/48320/Sundlink-Contractors#| title=Sundlink Contractors|lang=sv| publisher=Skanska| access-date=19 March 2025}}</ref> For the preparation of its tender, Sundlink had engaged the services of the engineering consultants [[COWI A/S|COWI]] from Denmark and [[sweco|VBB]] from Sweden. They were now tasked with developing the proposals in detail and controlling the further work.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Øresund Bridge
(section)
Add topic