Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Project management
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Work breakdown structure and other breakdown structures == {{Main |Work breakdown structure|Scope (project management)}} The [[work breakdown structure]] (WBS) is a [[tree structure]] that shows a subdivision of the activities required to achieve an objective β for example a portfolio, program, project, and contract. The WBS may be hardware-, product-, service-, or [[Business process|process]]-oriented (see an example in a [[:Image:NASA NF 533 reporting structure.jpg|NASA reporting structure (2001)]]).<ref name="NASA01">[http://nodis3.gsfc.nasa.gov/displayDir.cfm?Internal_ID=N_PR_9501_002D_&page_name=Chp2&format=PDF NASA NPR 9501.2D]. May 23, 2001.</ref> Beside WBS for project scope management, there are [[Organizational breakdown structure|organizational breakdown structure (chart)]], cost breakdown structure and [[risk breakdown structure]]. A WBS can be developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, sub-tasks, and work packages), which include all steps necessary to achieve the objective.<ref name="Stellman05"/> The work breakdown structure provides a common framework for the natural development of the overall planning and control of a contract and is the basis for dividing work into definable increments from which the statement of work can be developed and technical, schedule, cost, and labor hour reporting can be established.<ref name="NASA01"/> The work breakdown structure can be displayed in two forms, as a table with subdivision of tasks or as an organizational chart whose lowest nodes are referred to as "work packages". It is an essential element in assessing the quality of a plan, and an initial element used during the planning of the project. For example, a WBS is used when the project is scheduled, so that the use of work packages can be recorded and tracked. Similarly to work breakdown structure (WBS), other decomposition techniques and tools are: organization breakdown structure (OBS), product breakdown structure (PBS), cost breakdown structure (CBS), risk breakdown structure (RBS), and resource breakdown structure (ResBS).<ref>Levine, H. A. (1993). [https://www.pmi.org/learning/library/concepts-work-risk-organizational-breakdown-structures-3694 "Doing the weebis and the obis: new dances for project managers?" ''PM Network'', 7(4), 35β38.]</ref><ref name="Morcov2021">{{cite web|last=Morcov|first=S.|year=2021|title=Managing Positive and Negative Complexity: Design and Validation of an IT Project Complexity Management Framework|website=KU Leuven University|url=https://lirias.kuleuven.be/retrieve/637007}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Project management
(section)
Add topic