Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Nashua, New Hampshire
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==== Future railroad ==== Efforts are being made to extend the [[MBTA Commuter Rail|MBTA Commuter Rail's]] [[Lowell Line]] from [[Lowell, Massachusetts|Lowell]] to Manchester, stopping at Nashua along the way. The state legislature created the [[New Hampshire Rail Transit Authority]] (NHRTA) in 2007 with the goal of overseeing the development of commuter rail in the state. The proposed line would connect [[Lowell, Massachusetts]], to [[Bedford, New Hampshire]], with the end station being near the [[Manchester–Boston Regional Airport]].<ref>{{Cite news|url=http://www.wmur.com/article/commuter-rail-proposal-continues-to-move-forward/12833473|title=Commuter rail proposal continues to move forward|last=Wheeler|first=Christine DeLong|date=2017-10-11|work=WMUR|access-date=2017-10-14|language=en}}</ref><ref>{{Cite web|last=Andrew Sylvia|date=2021-08-30|title=Pappas on rail expansion: 'This is a project that continues to bubble from the bottom up here in New Hampshire' {{!}} Manchester Ink Link|url=https://manchesterinklink.com/local-leaders-gather-with-amtrak-representatives-to-discuss-proposed-downtown-rail-expansion/|access-date=2021-11-11|website=manchesterinklink.com|language=en-US}}</ref> As of November, 2022, an ongoing study by [[AECOM]] and the State of New Hampshire for design and financing is due to be completed by early 2023, and the project is awaiting federal funding.<ref>{{Cite web |title=Nashua – Manchester 40818 {{!}} Project Specific Information {{!}} Project Center {{!}} NH Department of Transportation |url=https://www.nh.gov/dot/projects/nashuamanchester40818/index.htm |access-date=2022-11-16 |website=www.nh.gov}}</ref> Nashua is proposed to have two station stops on the line, [[South Nashua station|South Nashua]], which would be located behind the [[Pheasant Lane Mall]] just north of the state line, and Nashua, which would be located in a rail yard near Crown Street in downtown Nashua and would utilize the existing Crown Street park-and-ride lot.<ref>{{Cite web |title=Welcome |url=https://www.dot.nh.gov/welcome |access-date=2024-02-13 |website=Department of Transportation |language=en}}</ref> Separately on October 11, 2017 the Nashua Board of Aldermen signed a memorandum of understanding with the now bankrupt [[Boston Surface Railroad]] Company for the creation of a rail line.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Nashua, New Hampshire
(section)
Add topic