Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
West Coast Main Line
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Recent developments == === Felixstowe and Nuneaton freight capacity scheme === {{Main|Birmingham to Peterborough Line}} A number of items of work are under way or proposed to accommodate additional freight traffic between the [[Haven ports]] and the Midlands including track dualling. The 'Nuneaton North Chord' was completed and opened on 15 November 2012.<ref>{{cite web |url=http://www.networkrail.co.uk/news/2012/november/Nuneaton-North-Chord-freight-line-now-open/ |title=Nuneaton North Chord freight line now open |date=15 November 2012 |publisher=Network Rail |access-date=15 November 2012 |archive-date=6 July 2015 |archive-url=https://web.archive.org/web/20150706021208/http://www.networkrail.co.uk/news/2012/november/Nuneaton-North-Chord-freight-line-now-open/ |url-status=dead }}</ref><ref>{{cite magazine |title=Work starts on Nuneaton chord |magazine=Rail |location=Peterborough |page=20 |date=10 August 2011}}</ref> The chord will ease access for some trains between the [[Birmingham to Peterborough Line]] and the WCML. The Ipswich chord was opened at the end of March 2014 allowing trains to run without reversing from Felixstowe towards the Midlands.<ref>{{cite web |url=http://www.networkrail.co.uk/news/2014/mar/The-new-Ipswich-chord-will-ease-a-major-bottleneck-on-the-Great-Eastern-main-line/ |title=The new Ipswich chord will ease a major bottleneck on the Great Eastern main line |date=25 March 2014 |publisher=Network Rail}}</ref> === Stafford Area Improvements Programme === A planned [[flying junction]] and {{convert|2.5|mi|km|abbr=on}} track diversion in the {{rws|Stafford}} β {{rws|Norton Bridge}} area. This replaced the previous level junction where the [[Stafford to Manchester Line|Stafford to Manchester via Stoke-on-Trent]] line diverges from the trunk route at Norton Bridge, avoiding conflicting train movements to enhance capacity and reduce journey times. This allowed two extra off-peak trains per hour from Euston to the North West, one extra train per hour from Manchester to Birmingham and one additional freight train per hour. Additional freight capacity was also provided around Stafford station. The resignalling work associated with this project was due to be completed in summer 2015 and the Norton Bridge work was complete in December 2016, followed by a new timetable introduced in December 2017.<ref>{{cite web |url=http://www.networkrail.co.uk/improvements/stafford-crewe/ |title=Stafford β Crewe rail enhancements |publisher=[[Network Rail]] |access-date=17 August 2015}}</ref> === Weaver Junction to Liverpool signalling === Re-signalling work the WCML spur track from Liverpool to [[Weaver Junction]] was underway in 2016. Signal control moved to the Manchester Rail Operating Centre removing five local signal boxes. The signalling improvements are intended to improve journey times on this section of line.<ref>{{Cite press release |url=https://www.networkrailmediacentre.co.uk/news/gbp-340m-railway-upgrade-planned-for-liverpool-city-region |title=Β£340m railway upgrade planned for Liverpool City Region |publisher=Network Rail}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
West Coast Main Line
(section)
Add topic