Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Crystal Palace, London
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Roads=== The area is served by the [[A212 road|A212]], [[A214 road|A214]], [[A234 road|A234]] and [[A2199 road]]s. The roads that make up the triangle (Westow Hill, Westow Street and Church Road) form part of a [[one-way system]] and are in a 24-hour [[controlled parking zone|controlled parking and loading zone]]. There is a coach park inside Crystal Palace Park. The area would have been affected by the cancelled [[London Ringways]] [[motorway]] plans, as one of the radial routes connecting the [[South Cross Route]] to [[London Ringways#Ringway 2|Ringway 2]] (the [[South Cross Route#South Cross Route to Parkway D Radial|South Cross Route to Parkway D Radial]]) would have run through a part of Crystal Palace Park, following the railway line.{{cn|date=September 2024}} ====Cycle routes==== [[London Cycle Network]] routes 23 and 27 travel through Crystal Palace. Route 27 runs from Anerley Hill through part of Crystal Palace Park towards [[Bromley]] and route 23 runs through the Crystal Palace triangle to connect to [[Borough, London|Borough]] and [[Croydon]].<ref name="openCycleMap">{{cite web|title=Open Cycle Map|url=http://www.opencyclemap.org/|publisher=OpenCycleMap|access-date=29 May 2013}}</ref> [[Transport for London]] have proposed to build [[Quietway]] route 7 that runs from Crystal Palace to [[Elephant and Castle]].<ref name="TfLQuietwayMap">{{cite web|title=Quietways β The First Seven Routes |url= http://content.tfl.gov.uk/quietways-routes-overview-2016.pdf |archive-url= https://web.archive.org/web/20161019202707/http://content.tfl.gov.uk/quietways-routes-overview-2016.pdf |archive-date=2016-10-19 |url-status=live |website=Transport for London |access-date=24 July 2017}}</ref> The route was subject to consultation processes in the London Boroughs of Lambeth and Southwark in 2016, with construction to begin in 2017.<ref name="SouthwarkQ7">{{cite web |title=Quietway 7 β Elephant and Castle to Crystal Palace |url=http://www.2.southwark.gov.uk/info/200431/street_improvements/4080/quietway_7_-_elephant_and_castle_to_crystal_palace |website=Southwark Council |access-date=24 July 2017 }}{{Dead link|date=August 2024 |bot=InternetArchiveBot |fix-attempted=yes }}</ref><ref name="LambethQ7">{{cite web |title=Proposed changes to Quietway 7 cycle route -Elephant & Castle to Crystal Palace- West Dulwich and Gipsy Hill β Series 1 |url= https://www.lambeth.gov.uk/consultations/proposed-changes-to-quietway-7-cycle-route-elephant-castle-to-crystal-palace-west |website=Lambeth Council |access-date=24 July 2017}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Crystal Palace, London
(section)
Add topic