Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Bootstrapping
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Electric power grid === {{Main|Black start}} An electric power grid is almost never brought down intentionally. Generators and power stations are started and shut down as necessary. A typical power station requires power for start up prior to being able to generate power. This power is obtained from the grid, so if the entire grid is down these stations cannot be started. Therefore, to get a grid started, there must be at least a small number of power stations that can start entirely on their own. A [[black start]] is the process of restoring a power station to operation without relying on external power. In the absence of grid power, one or more black starts are used to bootstrap the grid. ==== Nuclear power ==== A nuclear power plant always needs to have a way to remove decay heat, which is usually done with electrical cooling pumps. But in the rare case of a complete loss of electrical power, this can still be achieved by booting a turbine generator. As steam builds up in the steam generator, it can be used to power the turbine generator (initially with no oil pumps, circ water pumps, or condensation pumps). Once the turbine generator is producing electricity, the auxiliary pumps can be powered on, and the reactor cooling pumps can be run momentarily. Eventually the steam pressure will become insufficient to power the turbine generator, and the process can be shut down in reverse order. The process can be repeated until no longer needed. This can cause great damage to the turbine generator, but more importantly, it saves the nuclear reactor.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Bootstrapping
(section)
Add topic