Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Piccadilly line
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Future rolling stock === {{Main articles|London Underground 2024 Stock}} In the late 1990s, the Labour government initiated a [[public–private partnership]] (PPP) to reverse years of underinvestment in [[London Underground]].<ref name=":422">{{Cite news |date=16 December 2000 |title=New blow to Tube sell-off plan |language=en-GB |work=[[BBC News]] |url=http://news.bbc.co.uk/2/hi/uk_news/politics/1072193.stm |access-date=7 March 2021}}</ref> [[Tube Lines]] planned to order 93 new Piccadilly line trains, which would enter service by 2014.<ref name=":13">{{Cite web |date=8 January 2003 |title=Details of Tube modernisation plans unveiled |url=http://www.tubelines.com/news/releases/200602/20030108.aspx |url-status=dead |archive-url=https://web.archive.org/web/20060519094016/http://www.tubelines.com/news/releases/200602/20030108.aspx |archive-date=19 May 2006 |access-date=8 March 2021 |website=Tube Lines}}</ref> In January 2007, Tube Lines started the process of ordering new Piccadilly line trains, by querying if train manufacturers would be interested in supplying them.<ref name=":16">{{Cite web |date=15 January 2007 |title=Tube Lines invites expressions of interest from manufacturers for new Piccadilly line trains |url=http://www.tubelines.com/news/releases/200701/20070115.aspx |url-status=dead |archive-url=https://web.archive.org/web/20090224092920/http://www.tubelines.com/news/releases/200701/20070115.aspx |archive-date=2009-02-24 |access-date=2022-06-16 |website=[[Tube Lines]]}}</ref> Contract award was anticipated for 2008, and trains would enter service on the Piccadilly line in 2014.<ref name=":16" /> However, TfL bought out the Tube Lines consortium after cost overruns in 2010, formally ending the PPP.<ref>{{cite news |date=8 May 2010 |title=Tube maintenance back 'in house' as new deal is signed |publisher=[[BBC]] |url=http://news.bbc.co.uk/1/hi/england/london/8669823.stm |accessdate=9 May 2010}}</ref> In the mid 2010s, TfL began a process of ordering new rolling stock to replace trains on the Piccadilly, Central, Bakerloo and Waterloo & City lines.<ref name=":4">{{Cite web |date=October 2014 |title=New Tube for London - Feasibility Report |url=http://content.tfl.gov.uk/ntfl-feasibility-report.pdf |url-status=dead |archive-url=https://web.archive.org/web/20160305014932/http://content.tfl.gov.uk/ntfl-feasibility-report.pdf |archive-date=5 March 2016 |access-date=26 June 2022 |website=[[Transport for London]]}}</ref> A feasibility study into the new trains showed that new generation trains and re-signalling could increase capacity on the Piccadilly line by 60%, with 36 trains per hour.<ref name=":4" /> In June 2018, the [[Siemens Inspiro]] was selected.<ref>{{cite magazine |date=15 June 2018 |title=Siemens to supply London Underground deep tube fleet |url=http://www.metro-report.com/news/news-by-region/europe/single-view/view/siemens-to-supply-london-underground-deep-tube-fleet.html |magazine=Metro Report International}}</ref> These trains will have an open gangway design, wider doorways, air conditioning and the ability to run automatically with a new signalling system.<ref name=":14">{{Cite news |date=4 March 2021 |title=Piccadilly Line: Plans for new 'walk-through' trains unveiled |work=BBC News |url=https://www.bbc.com/news/uk-england-london-56273283 |access-date=5 March 2021}}</ref> However, TfL could only afford to order 94 trains at a cost of £1.5bn, and not the cost of resignalling and automating the line.<ref>{{Cite news |last=Harris |first=Simon |date=3 January 2018 |title=Plan to sell part of Tube fleet branded 'quite mad' |website=ITV News |url=https://www.itv.com/news/london/2018-01-03/plan-to-sell-part-of-london-underground-fleet-branded-quite-mad |access-date=6 March 2021}}</ref> Half of the trains will be built in [[Goole]], [[East Riding of Yorkshire]].<ref name=":10">{{cite news |date=15 June 2018 |title=East Yorkshire factory wins £1.5bn Tube train deal |publisher=BBC News |url=https://www.bbc.co.uk/news/uk-england-humber-44496526 |access-date=15 June 2018}}</ref> Trains are expected to enter service in 2025, and are currently undergoing testing at a depot in Germany.<ref name=":0">{{cite news |last=Lydall |first=Ross |date=4 March 2021 |title=First look: TfL unveils design of new Piccadilly line trains |work=Evening Standard |location=London |url=https://www.standard.co.uk/news/transport/design-new-piccadilly-line-trains-unveiled-tfl-b922086.html |access-date=4 March 2021}}</ref><ref>{{cite web | url=https://www.railwaygazette.com/metros/london-undergrounds-piccadilly-line-train-on-test/65383.article#:~:text=UK%3A%20The%20first%20of%2094,Test%20%26%20Validation%20Centre%20in%20Germany | title=London Underground's Piccadilly Line train on test }}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Piccadilly line
(section)
Add topic