Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Geostationary Operational Environmental Satellite
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Satellites== ===Operationally available=== Four GOES satellites are available for operational use. [[GOES 14|GOES-14]] is in storage at 105° W. The launch of this satellite, which was designated GOES-O before orbiting, was delayed several times.<ref name="goes-o">{{cite web|url=http://spaceflightnow.com/tracking/index.html|title=Spaceflight Now|archive-url=https://web.archive.org/web/20130911172414/http://spaceflightnow.com/tracking/index.html|archive-date=11 September 2013|url-status=dead|access-date=7 May 2009}}</ref><ref name="GOES-O">{{cite web|url=http://www.nasa.gov/mission_pages/GOES-O/main/index.html|title=GOES-O Mission Page|work=NASA|archive-url=https://web.archive.org/web/20090503071502/http://www.nasa.gov/mission_pages/GOES-O/main/index.html|archive-date=3 May 2009|url-status=live|access-date=7 May 2009}}</ref> It was launched successfully on 27 June 2009 from Space Launch Complex 37, on a Delta IV Medium rocket,<ref>{{cite web|url=http://www.nasa.gov/centers/kennedy/news/releases/2009/release-20090627.html|title=NASA and NOAA's GOES-O Satellite Successfully Launched|date=27 June 2009|publisher=NASA|archive-url=https://web.archive.org/web/20090629053451/http://www.nasa.gov/centers/kennedy/news/releases/2009/release-20090627.html|archive-date=29 June 2009|url-status=live|access-date=28 June 2009}}</ref> a [[Delta IV Medium|Delta IV M+ (4,2)]]. It underwent Post-Launch Testing until December 2009 and then was placed in on-orbit storage.<ref name="GOESstatus">{{cite web|url=http://www.oso.noaa.gov/goesstatus/|title=GOES Spacecraft Status Main Page|publisher=NOAA|archive-url=https://web.archive.org/web/20111227082214/http://www.oso.noaa.gov/goesstatus/|archive-date=27 December 2011|url-status=dead|access-date=28 December 2011}}</ref> This satellite is a part of the GOES-N Series. GOES-14 has been and will be activated should another GOES satellite suffer a problem or be decommissioned.<ref name="And">{{cite web|url=http://www.spaceref.com/news/viewpr.html?pid=28462|title=NASA and NOAA's GOES-O Satellite Ready for Launch|author=Goddard Space Flight Center|date=16 June 2009|publisher=SpaceRef Interactive Inc.|archive-url=https://archive.today/20130203074141/http://www.spaceref.com/news/viewpr.html?pid=28462|archive-date=3 February 2013|url-status=live|access-date=23 June 2009}}</ref> It was temporarily designated GOES-East because of technical difficulties with GOES-13 and moved towards the GOES-East location. After resolution of those problems, GOES-14 was returned to storage.<ref name="NOAA">{{cite web|url=http://www.nnvl.noaa.gov/MediaDetail2.php?MediaID=1195&MediaTypeID=1|title=GOES-14 Replaces GOES-13 as the GOES-East Satellite|publisher=NOAA|archive-url=https://web.archive.org/web/20121001003752/http://www.nnvl.noaa.gov/MediaDetail2.php?MediaID=1195&MediaTypeID=1|archive-date=1 October 2012|url-status=dead|access-date=24 September 2012}}</ref> [[GOES 15|GOES-15]], which was designated GOES-P before orbiting, was launched successfully on 4 March 2010,<ref name="nasa.gov">{{cite web|url=http://www.nasa.gov/missions/highlights/schedule.html|title=NASA's Shuttle and Rocket Launch Schedule|archive-url=https://web.archive.org/web/20080913085149/http://www.nasa.gov/missions/highlights/schedule.html|archive-date=13 September 2008|url-status=live|access-date=31 October 2009}}</ref><ref name="GOES-P Mission">{{cite web|url=http://www.nasa.gov/mission_pages/GOES-P/main/index.html|title=GOES-P Mission|publisher=NASA|archive-url=https://web.archive.org/web/20100304085051/http://www.nasa.gov/mission_pages/GOES-P/main/index.html|archive-date=4 March 2010|url-status=live|access-date=4 March 2010}}</ref> on a [[Delta IV Medium|Delta IV M+ (4,2)]]. From 2011 to 2018, it occupied the GOES-West position at 135°W over the Pacific Ocean.<ref name="GOES-15 Spacecraft Status Summary">{{cite web|url=http://www.oso.noaa.gov/goesstatus/spacecraftStatusSummary.asp?spacecraft=15|title=GOES-15 Spacecraft Status Summary|publisher=NOAA|archive-url=https://web.archive.org/web/20120415000112/http://www.oso.noaa.gov/goesstatus/spacecraftStatusSummary.asp?spacecraft=15|archive-date=15 April 2012|url-status=dead|access-date=27 December 2011}}</ref> It moved eastward to 128° W beginning on 29 October 2018 in order to make room for [[GOES-17]], which took over the GOES-West position on 10 December 2018.<ref name=":1">{{Cite web|url=https://www.goes-r.gov/users/transitionToOperations17.html|title=GOES-17 Transition to Operations │ GOES-R Series|website=www.goes-r.gov|language=en|access-date=2018-10-25}}</ref> GOES-15 operated in tandem with GOES-17 for some time, but was retired in early 2020 and moved to a parking orbit.<ref name="cimss.ssec.wisc.edu">{{Cite web |title=GOES-15 is no longer sending data — CIMSS Satellite Blog, CIMSS |date=2 March 2020 |url=https://cimss.ssec.wisc.edu/satellite-blog/archives/35844 |access-date=2023-05-04 |language=en-US}}</ref><ref name="goes.noaa.gov">{{Cite web | url=https://www.goes.noaa.gov/browsp.html |title = Pacific Tropical Infrared, GOES-West - NOAA GOES Geostationary Satellite Server}}</ref> GOES-15 was temporarily returned to operational status in August 2020 to fill a gap in the sensor capabilities of GOES-17 due to a hardware issue. [[GOES 16|GOES-16]] occupies the GOES-East position at 75° W. This satellite, which was designated GOES-R before orbiting, was launched by an [[Atlas V|Atlas V 541 rocket]] from [[Cape Canaveral Air Force Station Space Launch Complex 41|Space Launch Complex 41]] at [[Cape Canaveral Air Force Station]] in Florida on 19 November 2016.<ref name="Spaceflight Now">{{cite web | url=http://www.nasa.gov/mission_pages/goes-n/main/index.html | title=NASA Debuts the Entire 2008 Hurricane Season in New On-line Video | access-date=2009-06-28 | archive-date=2009-06-29 | archive-url=https://web.archive.org/web/20090629120928/http://www.nasa.gov/mission_pages/goes-n/main/index.html | url-status=dead }}</ref> It underwent Post-Launch Testing through early 2017 before replacing GOES-13 as GOES-East. [[GOES-17]] occupies the GOES-West position at 137.2° W. The satellite, designated as GOES-S before orbiting, was launched by an Atlas V 541 rocket from Space Launch Complex 41 on 1 March 2018.<ref>{{Cite web|url=https://www.nasaspaceflight.com/2018/03/ula-atlas-goes-s-launch/|title=ULA Atlas V successfully launches with GOES-S – NASASpaceFlight.com|language=en-US|access-date=2019-05-11|date=March 2018}}</ref> Following post-launch testing and troubleshooting of a problem in its imager, the satellite was declared operational in February 2019. ===Inactive or repurposed=== Several GOES satellites are still in orbit but are either inactive or have been re-purposed. Although [[GOES 3|GOES-3]] ceased to be used for weather operations in 1989, it spent over 20 years as a critical part of communications between the U.S. and [[Amundsen–Scott South Pole Station]] before being decommissioned in 2016.<ref>{{cite web |url=http://www.rsmas.miami.edu/news-events/press-releases/2016/goes-3-satellite-decommissioned-after-linking-antarctica-to-the-world-for-m |publisher=University of Miami |title=Goes-3 Satellite Decommissioned After Linking Antarctica To The World For More Than 20 Years |access-date=27 August 2017 |url-status=dead |archive-url=https://web.archive.org/web/20170828061654/http://www.rsmas.miami.edu/news-events/press-releases/2016/goes-3-satellite-decommissioned-after-linking-antarctica-to-the-world-for-m |archive-date=28 August 2017 }}</ref> Geostationary satellites expend fuel to keep themselves stationary over the equator, and thus cannot normally ordinarily be seen from the poles. When that fuel is depleted, solar and lunar perturbations increase the satellite's inclination so that its [[ground track]] begins to describe an [[analemma]] (a figure-8 in the north–south direction). This usually ends the satellite's primary mission. However, when the inclination is high enough the satellite may begin to rise above the polar horizons at the extremes of the figure-8, as was the case for GOES-3. A nine-meter dish was constructed at the station, and communication with the satellite could be obtained for about five hours per day. Data rates were around 2.048 megabytes/second (bi-directional) under optimum conditions. [[GOES 8|GOES-8]], which was designated GOES-I before orbiting, was the GOES-East satellite when it was in operation. It is in a parking orbit and is drifting westerly at a rate of about 4° daily.<ref>{{cite web | url=http://www.oso.noaa.gov/goesstatus/spacecraftStatusSummary.asp?spacecraft=8 | title=GOES-8 Spacecraft Status Summary | publisher=NOAA | access-date=29 June 2009 | url-status=dead | archive-url=https://web.archive.org/web/20060818232536/http://www.oso.noaa.gov/goesstatus/spacecraftStatusSummary.asp?spacecraft=8 | archive-date=18 August 2006 }}</ref> It was decommissioned on 1 April 2003 and deactivated on 5 May 2004 after the failure of its propulsion system.<ref>{{cite press release | url=http://www.noaanews.noaa.gov/stories2004/s2217.htm | title=NOAA DEACTIVATES GOES-8 AFTER 10 YEARS OF SERVICE | publisher=NOAA | date=3 May 2004 | access-date=25 August 2006 | url-status=live | archive-url=https://web.archive.org/web/20060929010143/http://www.noaanews.noaa.gov/stories2004/s2217.htm | archive-date=29 September 2006 }}</ref> [[GOES 10|GOES-10]], which was designated GOES-K before orbiting, was decommissioned on 2 December 2009 and was boosted to a [[graveyard orbit]]. It no longer had the fuel for required maneuvers to keep it on station.<ref>{{Cite web|url=http://cimss.ssec.wisc.edu/goes/blog/archives/3990|archive-url=https://web.archive.org/web/20091223031249/http://cimss.ssec.wisc.edu/goes/blog/archives/3990|url-status=dead|title=Farewell to GOES-10 « CIMSS Satellite Blog|archive-date=December 23, 2009}}</ref> [[GOES 11|GOES-11]], which was designated GOES-L before orbiting, had a partial failure on 6 December 2011. It was decommissioned on 16 December 2011 and boosted into a graveyard orbit. [[GOES 12|GOES-12]], which was designated GOES-M before orbiting, was decommissioned on 16 August 2013 and boosted into a graveyard orbit.<ref>{{cite web | url=http://www.ospo.noaa.gov/Operations/GOES/decommissioned.html | title=NOAA's Office of Satellite and Product Operations - GOES Status | website=www.ospo.noaa.gov | language=EN-US | access-date=24 June 2017 | url-status=live | archive-url=https://web.archive.org/web/20170604004447/http://www.ospo.noaa.gov/Operations/GOES/decommissioned.html | archive-date=4 June 2017 }}</ref> [[GOES 13|GOES-13]], which was designated GOES-N before orbiting, was decommissioned on 3 January 2018 and boosted into storage orbit. It was transferred to the [[United States Space Force|U.S. Space Force]] and positioned at 61.5ºE under the new name EWS-G1. Following three years of monitoring the Indian Ocean, EWS-G1 was retired on 31 October 2023 when EWS-G2 (formerly GOES-15) took over. [[GOES 15|GOES-15]], which was designated GOES-P before orbiting, was launched successfully on 4 March 2010.<ref name="nasa.gov"/><ref name="GOES-P Mission"/> From 2011 to 2018, it occupied the GOES-West position at 135°W over the Pacific Ocean.<ref name="GOES-15 Spacecraft Status Summary"/> It moved eastward to 128° W beginning on 29 October 2018 in order to make room for [[GOES-17]], which took over the GOES-West position on 10 December 2018.<ref name=":1"/> GOES-15 operated in tandem with GOES-17 for some time, but was retired in early 2020 and moved to a parking orbit.<ref name="cimss.ssec.wisc.edu"/><ref name="goes.noaa.gov"/> GOES-15 was temporarily returned to operational status in August 2020 to fill a gap in the sensor capabilities of GOES-17 due to a hardware issue. Like GOES-13, GOES-15 was then transferred to the U.S. Space Force and renamed EWS-G2 to monitor the Indian Ocean until approximately 2030. <gallery mode="packed" heights="160"> Image:GOES coverage.svg|Coverage map of GOES-11 and GOES-12 when active (2007). Image:GOES12Fulldiskvisible.png|GOES-12 visible light image. Image:GOES12Fulldiskwatervapor.png|GOES-12 water vapor image. </gallery>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Geostationary Operational Environmental Satellite
(section)
Add topic