Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Boeing AH-64 Apache
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Advanced Attack Helicopter=== {{main|Advanced Attack Helicopter}} [[File:Hughes experimental copter.jpg|thumb|right|An early [[Hughes Helicopters|Hughes]] YAH-64 prototype with T-tail]] After the [[Lockheed AH-56 Cheyenne|AH-56 Cheyenne]] was cancelled in 1972 in favor of projects like the [[U.S. Air Force]] [[Fairchild Republic A-10 Thunderbolt II|A-10 Thunderbolt II]] and the [[United States Marine Corps|Marine Corps]] [[Hawker Siddeley Harrier|AV-8A Harrier]], the United States Army sought an aircraft to fill an anti-armor attack role that would still be under Army command.<ref>{{cite news |title=Army Cancels Helicopter Contract |newspaper= Victoria Advocate |date= 10 August 1972}}</ref><ref>{{cite news |url=https://news.google.co.uk/newspapers?id=j8kPAAAAIBAJ&sjid=No0DAAAAIBAJ&pg=5294,127450&dq=advanced+attack+helicopter&hl=en |title=Army Decides To Scrap Cheyenne Helicopter Gunship |newspaper=Boca Raton News |date=3 September 1972}}</ref> The 1948 [[Key West Agreement]] forbade the Army from owning combat fixed-wing aircraft. The Army wanted an aircraft better than the [[Bell AH-1 Cobra|AH-1 Cobra]] in firepower, performance, and range. It would have the maneuverability for terrain following [[nap-of-the-earth]] (NoE) flying.<ref name=Bishop_p5>Bishop 2005, pp. 5β6.</ref> To this end, the U.S. Army issued a Request For Proposals (RFP) for the Advanced Attack Helicopter (AAH) program on 15 November 1972.<ref name=Army_p10>OAVCSA 1973, p. 10.</ref><ref>{{cite news |url=https://www.nytimes.com/1972/11/16/archives/army-seeking-bids-on-new-helicopter.html |title=Army Seeking Bids on New Helicopter |work=[[The New York Times]] |date=16 November 1972}}</ref> As a sign of the importance of this project, in September 1973 the Army designated its five most important projects as the "Big Five", with the AAH included.<ref>{{cite web |url=https://news.google.co.uk/newspapers?id=H64hAAAAIBAJ&sjid=hpoFAAAAIBAJ&pg=1762,200656&dq=advanced+attack+helicopter&hl=en |title=New Army Tactic |website=Reading Eagle |date=11 September 1973}}</ref> Proposals were submitted by [[Bell Helicopter|Bell]], [[Boeing Rotorcraft Systems|Boeing Vertol]]/[[Grumman]] team, [[Hughes Aircraft|Hughes]], [[Lockheed Corporation|Lockheed]], and [[Sikorsky Aircraft|Sikorsky]]. In July 1973, the U.S. Department of Defense selected finalists Bell and Hughes Aircraft's Toolco Aircraft Division (later [[Hughes Helicopters]]). This began the phase 1 of the competition.<ref name=Bishop_p7>Bishop 2005, p. 7.</ref> Each company built prototype helicopters and went through a flight test program. Hughes' ''Model 77/YAH-64A'' prototype first flew on 30 September 1975, while Bell's [[Bell YAH-63|Model 409/YAH-63A]] prototype first flew on 1 October 1975. After evaluating the test results, the Army selected Hughes' YAH-64A over Bell's YAH-63A in 1976. Reasons for selecting the YAH-64A included its more damage tolerant four-blade main rotor and the instability of the YAH-63's [[tricycle landing gear]] arrangement.<ref name=Richardson_Peacock_p8>Richardson and Peacock 1992, p. 8.</ref><ref name=Donald_p114>Donald 2004, p. 114.</ref> The AH-64A then entered phase 2 of the AAH program under which three pre-production AH-64s would be built, additionally, the two YAH-64A flight prototypes and the ground test unit were upgraded to the same standard.<ref name=Richardson_Peacock_p8/> Weapons and sensor systems were integrated and tested during this time, including the laser-guided [[AGM-114 Hellfire]] missile.<ref name=Bishop_p8>Bishop 2005, p. 8.</ref> Development of the Hellfire missile had begun in 1974, originally known by the name of ''Helicopter Launched, Fire and Forget Missile'' ('Hellfire' being a shortened acronym),<ref>{{cite web |url=http://www.boeing.com/history/bna/hellfire.htm |title=AGM-114 Hellfire missile |publisher=Boeing |access-date=30 July 2011 |url-status=dead |archive-url=https://web.archive.org/web/20110914210609/http://www.boeing.com/history/bna/hellfire.htm |archive-date=14 September 2011}}</ref> for the purpose of arming helicopter platforms with an effective anti-tank missile.{{citation needed|date=February 2023}}
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Boeing AH-64 Apache
(section)
Add topic