Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Earned value management
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== To-complete performance index (TCPI) === To-complete performance index (TCPI) is an earned value management measure that estimates the cost performance needed to achieve a particular management objective.{{sfn | Project Management Institute | 2021 | loc=Β§2.7.2.7 Forecasts}} The TCPI provides a projection of the anticipated performance required to achieve either the BAC or the EAC. TCPI indicates the future required cost efficiency needed to achieve a target BAC (Budget At Complete) or EAC (Estimate At Complete). Any significant difference between CPI, the cost performance to date, and the TCPI, the cost performance needed to meet the BAC or the EAC, should be accounted for by management in their forecast of the final cost. For the TCPI based on BAC (describing the performance required to meet the original BAC budgeted total): <math>TCPI_{BAC} = { BAC - EV \over BAC - AC }</math> or for the TCPI based on EAC (describing the performance required to meet a new, revised budget total EAC): <math>TCPI_{EAC} = { BAC - EV \over EAC - AC }</math> This implies, that if revised budget (EAC) is calculated using Earned Value methodology formula (BAC/CPI), then at the moment, when TCPI based on EAC is first time calculated, it will always be equal to CPI of a project at that moment. This happens because when EAC is calculated using formula BAC/CPI it is assumed, that cost performance of the remaining part of the project will be the same as the cost performance of the project to date. [[File:Earned Value Calculations TCPI EAC and ETC.png|thumb|alt=Earned Value Calculations: TCPI, EAC and ETC|To-Complete Performance Index (TCPI) for 3 scenarios.]] The graph illustrates three scenarios outlined in PMI's "''Process Group: A Practice Guide''" (2022 edition, p. 311): # The To-Complete Performance Index (TCPI) required to complete the project on plan, assuming the Budget at Completion (BAC) remains unchanged (i.e., '''EAC = BAC'''). # The Estimated At Completion (EAC) calculated under the assumption that the Cost Performance Index (CPI) remains constant (i.e., '''TCPI = CPI'''). # The EAC calculated under the assumption that future work will be accomplished at the planned rate (i.e., '''TCPI = 1''').
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Earned value management
(section)
Add topic