Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Panama Canal
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Capacity=== [[File:Vessel draft restrictions on the Panama Canal by locks.webp|thumb|Vessel draft restrictions on the Panama Canal by locks 2022β2024 {{legend-line|#4A7772 solid 3px|[[Panamax#Neopanamax|Neopanamax]]}} {{legend-line|#2A3066 dashed 3px|[[Panamax]]}} ]] The canal handles more vessel traffic than had ever been envisioned by its builders. In 1934, it was estimated that the maximum capacity of the canal would be around 80 million tons per year.<ref>{{Cite book |url=http://www.czimages.com/CZMemories/thirdlocks/tlpage3.htm |title=The Land Divided{{snd}}A History of the Panama Canal and other Isthmian Canal Projects |first=Gerstle |last=Mack |year=1944 |access-date=7 January 2006 |archive-date=1 May 2013 |archive-url=https://web.archive.org/web/20130501112749/http://www.czimages.com/CZMemories/thirdlocks/tlpage3.htm |url-status=live }}</ref> In 2015, canal traffic reached 340.8 million tons of shipping. To improve capacity, a number of improvements have been made to maximize the use of the locking system:<ref name="3rdLockProposal"> {{cite web |url=http://www.acp.gob.pa/eng/plan/documentos/propuesta/acp-expansion-proposal.pdf |title=Proposal for the Expansion of the Panama Canal |date=24 April 2006 |publisher=Panama Canal Authority |archive-url=https://web.archive.org/web/20110721055325/http://www.acp.gob.pa/eng/plan/documentos/propuesta/acp-expansion-proposal.pdf |archive-date=21 July 2011 |page=45}} </ref> * Implementation of an enhanced locks lighting system; * Construction of two tie-up stations in Culebra Cut; * Widening Culebra Cut from {{cvt|192|to|218|m|ft|sp=us}}; * Improvements to the tugboat fleet; * Implementation of the carousel lockage system in Gatun locks; * Development of an improved vessel scheduling system; * Deepening of Gatun Lake navigational channels from {{cvt|10.4|to|11.3|m|ft|sp=us}} PLD; * Modification of all locks structures to allow an additional draft of about {{cvt|1|ft|m|sp=us|order=flip}}; * Deepening of the Pacific and Atlantic entrances; * Construction of a new spillway in Gatun, for flood control. These improvements enlarged the capacity from 300 million PCUMS in 2008, to 340 PCUMS in 2012. These improvements were started before the new locks project, and are complementary to it.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Panama Canal
(section)
Add topic