Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Ramp meter
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== New Zealand === [[Image:North Western to Northern On.jpg|thumb|Ramp metering on [[Northwestern Motorway|North Western]] to [[Auckland Northern Motorway|Northern]] connection in [[Auckland]].]] [[Auckland]] has currently 91 ramp meters across the Southern, South Western, Northern and North Western motorways making it the largest [[Southern Hemisphere]] ramp metering system.<ref name="AO2014">{{cite book |doi=10.1109/ITSC.2014.6958028 |chapter=SCATS Ramp Metering: Strategies, arterial integration and results |title=17th International IEEE Conference on Intelligent Transportation Systems (ITSC) |date=2014 |last1=Aydos |first1=J. Carlos |last2=O'Brien |first2=Andrew |pages=2194–2201 |isbn=978-1-4799-6078-1 |s2cid=14985214 }}</ref> Ramp metering was installed Auckland-wide after a successful trial on Mahunga Drive in 2004,<ref>Brown T. et al. [https://web.archive.org/web/20110508135808/http://www.ipenz.org.nz/ipenztg/papers/2005/08_Brown_Clark_Evans_Wee.pdf New Zealand’s Easy Merge Ramp Signal (Ramp Metering) Trial]</ref> before the [[Mangere Bridge (bridges)|Mangere Bridge]]. Traffic data collected from 25 ramp metering sites in 2007 (before ramp metering deployment) and 2009 (after) shows an average 25% improvement in both congestion duration and traffic speed as well as an 8% increase in traffic throughput. The data also shows an average reduction in crashes of 22%.<ref name="AO2014"/> This performance and safety data translates into estimated benefits of US$1.6M per ramp metering site per year. The system controlling the ramps promotes the traditional coordination among on-ramps as well as real-time integration with traffic signals on the adjacent arterial network allowing the whole road network to be managed as a single integrated network.<ref>Aydos J.C. et al. ''[http://trid.trb.org/view.aspx?id=1279859 A Study on Integrated SCATS Intersection and Ramp Metering Control]'', Proceedings of the 19th ITS World Congress, Vienna, 2012</ref> For example, when motorway incidents adversely impact the adjacent arterial roads, an automatic response to the arterial traffic signals can be triggered to mitigate the impacts of the incident and vice versa. Recurrent and excessive traffic queues at on-ramp and off-ramp can also be managed in an integrated way in real-time. This integrated management is possible in Auckland because the same adaptive [[SCATS]] system controls both arterial traffic lights and motorway ramp meters. The term ''Ramp Signalling''<ref>[http://www.nzta.govt.nz/network/projects/ramp-signalling/ Ramp Signalling] {{webarchive|url=https://web.archive.org/web/20141029014834/http://www.nzta.govt.nz/network/projects/ramp-signalling/ |date=2014-10-29 }}</ref> rather than ''Ramp Metering'' is purposefully adopted in New Zealand as a user-oriented name.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Ramp meter
(section)
Add topic