Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Sydney Harbour Bridge
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Maintenance=== [[File:Sydney Harbour Bridge maintenance, 18 September 1945.jpg|thumb|Maintenance worker Stan Giddings painting the bridge, 1945.]] The Sydney Harbour Bridge requires constant inspections and other maintenance work to keep it safe for the public, and to protect from [[corrosion]]. Among the trades employed on the bridge are [[House painter and decorator|painter]]s, [[ironworker]]s, [[boilermaker]]s, [[machinist|fitter]]s, [[electrician]]s, [[plasterer]]s, [[carpenter]]s, [[plumber]]s, and [[Rigger (industry)|riggers]].<ref name=repaint-rta /> The most noticeable maintenance work on the bridge involves painting. The steelwork of the bridge that needs to be painted is a combined {{convert|485000|m2|acre|abbr=on}}, the equivalent of sixty football fields. Each coat on the bridge requires some {{convert|30000|L|impgal|abbr=on}} of paint.<ref name=repaint-rta /> A special fast-drying paint is used, so that any paint drops have dried before reaching the vehicles or bridge surface.<ref name=tia-shb /> One notable identity from previous bridge-painting crews is Australian comedian and actor [[Paul Hogan]], who worked as a bridge rigger before rising to media fame in the 1970s.<ref name="culture.gov" /> In 2003 the Roads & Traffic Authority began completely repainting the southern approach spans of the bridge. This involved removing the old [[Lead paint|lead-based paint]], and repainting the {{convert|90000|m2|acre|abbr=on}} of steel below the deck. Workers operated from self-contained platforms below the deck, with each platform having an air extraction system to [[Air filter|filter]] [[airborne particles]]. An [[abrasive blasting]] was used, with the lead waste collected and safely removed from the site for disposal.<ref name=repaint-rta /> Between December 2006 and March 2010 the bridge was subject to works designed to ensure its longevity. The work included some strengthening.<ref name=shb-upgrade>{{cite web|url=http://www.freyssinet.com.au/images/job-sheets/Sydney%20Harbour%20Bridge%20Upgrade.pdf|access-date=16 September 2014|title=Sydney Harbour Bridge Upgrade|archive-url=https://web.archive.org/web/20150904021220/http://www.freyssinet.com.au/images/job-sheets/Sydney%20Harbour%20Bridge%20Upgrade.pdf|archive-date=4 September 2015|url-status=live}}</ref> Since 2013, two grit-blasting robots specially developed with the [[University of Technology, Sydney]] have been employed to help with the paint stripping operation on the bridge.<ref>{{cite web |author=Wendy Frew |url=http://www.smh.com.au/technology/sci-tech/spick-and-span-20130717-2q1av.html |title=Spick and span |work=The Sydney Morning Herald |date=18 July 2013 |access-date=9 June 2014 |archive-date=24 September 2023 |archive-url=https://web.archive.org/web/20230924100444/https://www.smh.com.au/technology/spick-and-span-20130716-2q1av.html |url-status=live }}</ref> The robots, nicknamed Rosie and Sandy,<ref>{{cite web |last=Bryant |first=Chris |url=http://www.ft.com/cms/s/0/7d398f90-ec8e-11e3-8963-00144feabdc0.html#slide0 |title=Dawn of a robot revolution as army of machines escape the factory |work=[[Financial Times]]|date=5 June 2014 |access-date=9 June 2014 |archive-url=https://web.archive.org/web/20140608215640/http://www.ft.com/cms/s/0/7d398f90-ec8e-11e3-8963-00144feabdc0.html#slide0 |archive-date=8 June 2014 |url-status=live }}</ref> are intended to reduce workers' potential exposure to dangerous lead paint and [[asbestos]] and the blasting equipment which has enough force to cut through clothes and skin.<ref>{{cite web |url=https://www.bbc.co.uk/news/world-asia-23352958 |title=Grit-blasting robots clean Sydney Harbour Bridge |publisher=bbc.co.uk |date=18 July 2013 |access-date=9 June 2014 |archive-url=https://web.archive.org/web/20140106185621/http://www.bbc.co.uk/news/world-asia-23352958 |archive-date=6 January 2014 |url-status=live }}</ref> <gallery mode="packed-hover" heights="200px"> File:Painting Sydney Harbour Bridge 1945 04.jpg|Stan Giddings, maintenance worker painting Sydney Harbour Bridge, 1945, by Alec Iverson File:Sydney Harbour Bridge DSC01595.JPG|Maintenance crew painting the bridge File:SydneyHarbourBridgeHangers.jpg|Bridge arch after strengthening, with some new steel outlined in red </gallery>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Sydney Harbour Bridge
(section)
Add topic