Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Shinkansen
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Planned lines === * The extension of [[Hokuriku Shinkansen]] to [[Osaka]] is proposed, with the route via Obama and Kyoto selected by the government on 20 December 2016.<ref name="railwaygazette.com" /> Construction is proposed to commence in 2030, and take 15 years. * [[Nishi Kyushu Shinkansen]] has been built to full Shinkansen standards between Takeo-Onsen and Nagasaki, with the existing narrow-gauge line from Shin-Tosu to Takeo Onsen to remain as narrow-gauge track, although there is a proposal to build the section between Shin-Tosu and Takeo Onsen to full Shinkansen standards. In 2018, the [[Ministry of Land, Infrastructure, Transport and Tourism]] released [[cost-benefit analysis]] results to compare and contrast full Shinkansen, [[Mini-shinkansen]], and [[Gauge Change Train]] for this section.<ref>{{cite web |date=30 March 2018 |title=九州新幹線(西九州ルート)の整備のあり方に係る調査について |trans-title=About the investigation about the maintenance of the Kyushu Shinkansen (West Kyushu route) |url=https://www.mlit.go.jp/report/press/tetsudo03_hh_000081.html |url-status=live |archive-url=https://web.archive.org/web/20220705064325/https://www.mlit.go.jp/report/press/tetsudo03_hh_000081.html |archive-date=5 July 2022 |access-date=29 August 2021 |website=mlit.co.jp |language=ja}}</ref> {| class="wikitable" |- ! Line ! Route ! Speed ! Length ! Construction<br />proposed ! Expected start of<br />revenue services |- | [[Nishi Kyushu Shinkansen]] Phase 2 | [[Takeo-Onsen Station|Takeo-Onsen]] – [[Shin-Tosu Station|Shin-Tosu]] | {{convert|260|km/h|0|abbr=on}} | TBD | TBD | TBD |- | [[Hokuriku Shinkansen]] Phase 4 | [[Tsuruga Station|Tsuruga]] – [[Shin-Ōsaka Station|Shin-Ōsaka]] (via [[Obama Station|Obama]] and [[Kyōto Station|Kyoto]]) | {{convert|260|km/h|0|abbr=on}} | TBD | 2030 | FY2045 |- | [[Chūō Shinkansen]] Phase 2 | [[Nagoya Station|Nagoya]] – [[Shin-Ōsaka Station|Shin-Ōsaka]] | {{convert|505|km/h|0|abbr=on}} | {{convert|152.4|km|0|abbr=on}} | TBD | Unknown<ref name="kyodo03Jul20">{{cite web |author=<!--Not stated--> |date=3 July 2020 |title=JR Central gives up on opening new maglev train service in 2027 |url=https://english.kyodonews.net/news/2020/07/a97dfd2524f6-shizuoka-says-no-to-construction-for-new-maglev-train-service.html |access-date=8 July 2020 |publisher=Kyodo}}</ref> <small>(Originally 2037)</small> |}
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Shinkansen
(section)
Add topic