Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Northern line
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Services== <!-- {{Citation needed|reason=unclear|date=September 2021}} --> === Peak === As of September 2021, morning peak southbound services are:<ref name="londonreconnections.com" /> *4 {{Abbr|tph|trains per hour}} from Edgware to Battersea Power Station via Charing Cross *2 tph from Edgware to Morden via Charing Cross *12 tph from Edgware to Morden via Bank *10 tph from High Barnet to Battersea Power Station via Charing Cross *2 tph from High Barnet to Morden via Charing Cross *8 tph from High Barnet to Morden via Bank *2 tph from Mill Hill East to Battersea Power Station via Charing Cross *2 tph from Mill Hill East to Morden via Bank This service pattern provides 20 tph between Finchley Central and High Barnet, 4 tph between Finchley Central and Mill Hill East, 16 tph between Kennington and Battersea Power Station and 22 tph everywhere else on the line except between Kennington and Morden, between Camden Town and Finchley Central and on the Edgware branch where there will be 24 tph. === Off-peak === As of November 2022, off-peak services are the similar to peak services, minus the four hourly trains that run from Morden to the northern branches via Charing Cross:<ref name="londonreconnections.com">{{cite web|url=http://www.londonreconnections.com/2015/northern-line-timetable-for-the-future/|title=Twin Peaks: Timetable Changes on the Northern Line|work=London Reconnections|date=14 January 2015|access-date=25 October 2015|archive-date=12 May 2015|archive-url=https://web.archive.org/web/20150512144642/http://www.londonreconnections.com/2015/northern-line-timetable-for-the-future/|url-status=live}}</ref> *10 tph from Edgware to Battersea Power Station via Charing Cross *10 tph from Edgware to Morden via Bank *8 tph from High Barnet to Battersea Power Station via Charing Cross *8 tph from High Barnet to Morden via Bank *2 tph from Mill Hill East to Battersea Power Station via Charing Cross *2 tph from Mill Hill East to Morden via Bank This service pattern provides 16 tph between Finchley Central and High Barnet, 4 tph between Finchley Central and Mill Hill East, and 20 tph everywhere else on the line. === Night === Since 2016, the Northern line has operated [[Night Tube]] services on Friday and Saturday nights between the Edgware and High Barnet termini and Morden, via the Charing Cross branch only. Trains run every 15 minutes on each of the northern branches, combining to give eight trains per hour between Camden Town and Morden. There is no Night Tube service on the Mill Hill East, Bank, or Battersea branches.<ref name=":3" /> *4 tph from High Barnet to Morden via Charing Cross *4 tph from Edgware to Morden via Charing Cross
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Northern line
(section)
Add topic