Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
M1 motorway
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Smart Motorways === ==== M1 widening and variable speed limits, junctions 6A to 10 (M25 to Luton South) ==== Work began on the {{convert|10|mi|km|adj=on}} section between the [[M25 motorway|M25]] and Luton (J6A-J10) in 2006 and opened in 2009, which included the construction of new parallel [[Local–express lanes|collector-distributor lanes]] between junctions 7 and 8. The [[M10 motorway (Great Britain)|M10]] spur was built as a motorway because it inevitably led to the M1, but as non-motorway traffic could now travel between the A414 at Hemel Hempstead and Park Street Roundabout without having to access the M1, the M10 was downgraded to an [[Great Britain road numbering scheme|A road]], and designated as part of the [[A414 road|A414]] to allow for this. The work also included widening or replacement of 11 underbridges on one or both carriageways, and replacing seven overbridges<ref>{{cite web|title=M1 Jct 6a to 10 Widening|url=http://www.highways.gov.uk/roads/projects/4478.aspx|url-status=dead|archive-url=https://web.archive.org/web/20090916021803/http://www.highways.gov.uk/roads/projects/4478.aspx|archive-date=16 September 2009|publisher=Highways Agency}}</ref> at a total cost of £294 million.<ref>{{cite web|title=9 Mar 2009 : Column 10W—continued|url=https://publications.parliament.uk/pa/cm200809/cmhansrd/cm090309/text/90309w0003.htm|work=Hansard}}</ref> A [[Smart motorway|variable mandatory speed limit]] system was installed, making this the first [[smart motorway]] scheme on the M1. ==== M1 dynamic hard shoulder running, junctions 10 to 13 (Luton South to Milton Keynes South) ==== Work to introduce [[Smart motorway#Dynamic hard shoulder running|dynamic hard shoulder running]] on approximately {{convert|15|mi|km}} of motorway between Luton and Milton Keynes (J10-J13) was completed in December 2012, at a total cost of £327 million.<ref>{{cite web|title=M1 Junctions 10–13 Improvements|url=http://www.highways.gov.uk/roads/road-projects/m1-junction-10-13-improvements/|url-status=dead|archive-url=http://webarchive.nationalarchives.gov.uk/20140207102850/http://www.highways.gov.uk/roads/road-projects/m1-junction-10-13-improvements/|archive-date=7 February 2014|publisher=Highways Agency}}</ref> This made the hard shoulder available to be opened as a traffic lane where additional capacity was necessary. Modifications were made to junctions 11 and 12,<ref name="HA5">{{cite web|title=M1 Jct 10 to 13 Improvements|url=http://www.highways.gov.uk/roads/projects/4482.aspx|url-status=dead|archive-url=https://web.archive.org/web/20120629032930/http://www.highways.gov.uk/roads/projects/4482.aspx|archive-date=29 June 2012|publisher=Highways Agency}}</ref> to allow for four lanes running through each junction, and the [[A421 road|A421]] from junction 13 to the [[Bedford]] southern bypass was also upgraded to two lanes each way during this period.<ref>{{cite web|title=A421 Bedford to M1 Junction 13|url=http://www.highways.gov.uk/roads/projects/4584.aspx|url-status=dead|archive-url=https://web.archive.org/web/20110605115952/http://www.highways.gov.uk/roads/projects/4584.aspx|archive-date=5 June 2011|publisher=Highways Agency}}</ref> The scheme will likely be converted to [[Smart motorway#All lane running|all lane running]] at some point in the 2020 decade, alongside all other dynamic hard shoulder running schemes. This was because a Government review into smart motorways found dynamic hard shoulder running was too confusing for drivers, leading to plans to convert all dynamic hard shoulders into permanent running lanes.<ref>{{cite web|last=|title=Action plan announced to boost smart motorway safety|url=https://www.gov.uk/government/news/action-plan-announced-to-boost-smart-motorway-safety|access-date=19 June 2020|website=GOV.UK}}</ref> ==== M1 widening and variable speed limits, junctions 25–28 (Nottingham to Mansfield) ==== Work to widen the {{convert|15|mi|km|adj=on}} section from Nottingham to [[Mansfield]] (J25-J28) to four lanes each way began in October 2007 and was completed in May 2010, at a cost of £340 million.<ref>{{cite web|title=M1 widening J25-28: work to reduce congestion and improve safety starts in earnest|url=http://www.highways.gov.uk/news/newsroom.aspx?pressreleaseid=156326|url-status=dead|archive-url=https://web.archive.org/web/20110605130555/http://www.highways.gov.uk/news/newsroom.aspx?pressreleaseid=156326|archive-date=5 June 2011|access-date=20 January 2008|publisher=Highways Agency}}</ref><ref>{{cite web|title=£340m M1 contract to MVM consortium|url=http://www.emcbe.com/january-constructive-article6.html|url-status=dead|archive-url=https://web.archive.org/web/20160117183458/http://www.emcbe.com/january-constructive-article6.html|archive-date=17 January 2016}}</ref> A 50 mph limit, enforced by [[Traffic enforcement camera|average speed cameras]], was imposed for the period of construction, but it proved to be so effective that a permanent variable mandatory speed limit system was installed.<ref>{{cite news|date=3 January 2010|title=M1 works speed cameras will stay|work=BBC News|url=http://news.bbc.co.uk/1/hi/england/nottinghamshire/8438375.stm|quote=Temporary cameras installed for widening road works between junctions 25 and 28 have proved so effective they will stay, it has been confirmed.}}</ref> In 2023, following a previous debate on the issue, local MPs [[Mark Fletcher (politician)|Mark Fletcher]] and [[Lee Anderson (British politician)|Lee Anderson]] called on the government to upgrade junction 28, describing it as a "pinch point" disadvantaging local residents and businesses.<ref>[https://www.chad.co.uk/news/transport/mps-to-gather-in-westminster-to-call-for-improvements-to-m1-junction-near-mansfield-4142811 MPs to gather in Westminster to call for improvements to M1 junction near Mansfield] ''Chad'', 16 May 2023. Retrieved 27 December 2023</ref><ref>[https://www.bbc.co.uk/news/uk-england-derbyshire-67661397 M1: New plans for junction 28 upgrade to be sent to government] ''[[BBC News]]'', 11 December 2023. Retrieved 27 December 2023</ref> ==== M1 widening and variable speed limits, junctions 13–16 (Milton Keynes South to Northampton West) ==== National Highways converted the existing {{convert|23|mi| adj = on}} section of the M1 between Milton Keynes and Northampton (J13-J16) into an all-lane-running (ALR) smart motorway consisting of four lanes running in both directions without a hard shoulder, with the project's cost being £373{{nbsp}}million. Construction began in January 2018, with the scheme opening in stages until 9 March 2023, when the project was fully complete.<ref>{{cite web |url=https://nationalhighways.co.uk/our-roads/east/m1-junction-13-to-junction-16-smart-motorway/#documents |title=M1 junction 13 to junction 16: smart motorway |publisher = National Highways |date = 9 January 2023 |access-date = 22 January 2023}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
M1 motorway
(section)
Add topic