Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Dartford Crossing
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Future== {{Main|Lower Thames Crossing}} Since the 2000s, planning work has been underway regarding another crossing of the Thames to ease congestion at the Dartford Crossing.<ref>{{cite web |title=Dartford River Crossing Study into Capacity Requirement |website=[[The National Archives (United Kingdom) |National Archives]] |url=https://webarchive.nationalarchives.gov.uk/ukgwa/20100604222158/http://www.dft.gov.uk/about/strategy/capacityrequirements/dartfordrivercrossing/ |access-date=10 April 2022}}</ref><ref>{{cite web |title=New river crossing given go-ahead in East London |website=ITV News |date=10 May 2018 |url=https://www.itv.com/news/london/2018-05-10/new-bridge-crossing-given-go-ahead-in-east-london/}}</ref> Options considered included an additional crossing at Dartford for long distance M25 traffic, as well as new crossings located in the [[Swanscombe]] or [[Tilbury]] area.<ref name="DfT">{{cite web |date=20 April 2009 |title=Dartford River Crossing Study into Capacity Requirement |publisher=Department for Transport |url=http://www.dft.gov.uk/about/strategy/capacityrequirements/dartfordrivercrossing/chap1execsummary.pdf |access-date=27 June 2014 |archive-url=http://webarchive.nationalarchives.gov.uk/20100513123749/http://www.dft.gov.uk/about/strategy/capacityrequirements/dartfordrivercrossing/ |archive-date=13 May 2010}}</ref> In 2017, a route connecting the M25 at [[North Ockendon]] to the A2 at [[Thong, Kent|Thong]] was selected.<ref>{{cite news |date=12 April 2017 |title=Lower Thames Crossing Consultation |publisher=Highways England |url=https://highwaysengland.citizenspace.com/cip/lower-thames-crossing-consultation/}}</ref> The new road will be {{Convert|14.3|mi|km|abbr=|adj=}} in length, and have a {{Convert|2.6|mi|km|abbr=unit}} twin-bore tunnel crossing under the River Thames east of [[Gravesend]] and Tilbury. The crossing is estimated to cost between Β£6.4 billion and Β£8.2 billion, taking about six years to build once permission is granted.<ref>{{cite web |title=Road Investment Strategy 2: 2020β2025 |page=90 actual doc page numbering or 96/131 pdf doc numbering |url=https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/951100/road-investment-strategy-2-2020-2025.pdf}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Dartford Crossing
(section)
Add topic