Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Tameside
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Transport== ===Railway=== [[File:Fairfield railway station 1.jpg|right|thumb|[[Fairfield railway station (Greater Manchester)|Fairfield railway station]]]] The borough is served by 13 railway stations: *[[Fairfield railway station (Greater Manchester)|Fairfield]], [[Guide Bridge railway station|Guide Bridge]], [[Hyde Central railway station|Hyde Central]] and [[Hyde North railway station|Hyde North]] are all on the [[Hope Valley Line]] between [[Sheffield]] and Manchester. *[[Broadbottom railway station|Broadbottom]], [[Flowery Field railway station|Flowery Field]], [[Godley railway station|Godley]], Guide Bridge, [[Hattersley railway station|Hattersley]] and [[Newton for Hyde railway station|Newton for Hyde]] are served by the [[Glossop Line]] between Glossop, [[Hadfield railway station|Hadfield]] and Manchester. *[[Ashton-under-Lyne railway station|Ashton]], [[Mossley railway station|Mossley]] and [[Stalybridge railway station|Stalybridge]] are on the [[Huddersfield Line]]. *[[Denton railway station|Denton]] is on the [[Stockport to Stalybridge Line]]. <br> ===Tram=== Work on an extension of the [[Manchester Metrolink]] costing Β£260 million began in 2008. Trams began to run to Droylsden in February 2013 and finally to Ashton in September 2013. ===Buses=== Ashton bus station was converted into a new transport interchange. A covered concourse replaced the five island platforms and the site was linked to the Metrolink terminus. It has new waiting areas, bicycle parking and better access to travel information and tickets. Improved pedestrian routes can now take people into the town centre. It was completed in October 2020.<ref>{{Cite web|url=https://tfgm.com/ashton-interchange|title=Ashton Interchange|website=TfGM|access-date=9 August 2019}}</ref> The new Hyde bus station opened on 23 August 2007, having cost Β£3.7 million to build. ===Footpaths=== Tameside Council is responsible for maintaining the public rights of way in the borough, including {{convert|145|miles|km|abbr=on}} of footpaths.<ref>{{cite web|title=Rights of way |url=http://www.tameside.gov.uk/rightsofway |author=Tameside Metropolitan Borough Council |author-link=Tameside Metropolitan Borough Council |publisher=Tameside.gov.uk |date=16 January 2007}} Retrieved on 5 September 2008.</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Tameside
(section)
Add topic