Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Economy of Papua New Guinea
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====Renewable energy==== A study by Bloomberg New Energy Finance ranked PNG in the top 10 for potential renewable resources, with about 2.5 GW of these but only 2% of it exploited.<ref>{{Cite web|url=http://www.oxfordbusinessgroup.com/country/papua-new-guinea/energy|title=Myanmar|date=12 December 2022 }}</ref> =====Hydroelectric projects===== The [[Yonki Dam]] project, which commenced operation in 1991, on the Ramu River has generation capacity of 77 MW (103,000 hp) (Ramu 1) plus proposed additional capacity of 18 MW. ======Proposed projects====== The list of intended projects include the US$2 billion Ramu 2 hydro project on the Ramu River to be built under a public-private partnership with Shenzhen Energy Group.<ref>{{cite journal |last1=McLeod |first1=Shane |title=Plugging in PNG: electricity, partners and politics |journal=The Interpreter (Lowy Institute) |date=10 April 2019 |url=https://www.lowyinstitute.org/the-interpreter/plugging-png-electricity-partners-and-politics |access-date=5 May 2020}}</ref> Edevu Dam is to be constructed by PNG Hydro Development Ltd (PNGHDL) to generate 50 Megawatts (MW).<ref>{{cite web |last1=PNG Power Ltd |title=Edevu Hydro |url=http://www.pngpower.com.pg/index.php/projects/view/edevu-hydro |website=PNG Power company site |publisher=PNG Power |access-date=5 May 2020}}</ref> Consultants to PNG Power have conducted feasibility studies for the Naoro Brown hydroelectricity Project which would supply up to 80MW of electricity to the Port Moresby grid.<ref>{{cite web |last1=Entura |title=Naoro Brown hydroelectric project |url=https://www.entura.com.au/projects/5397/ |website=Entura |access-date=5 May 2020}}</ref>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Economy of Papua New Guinea
(section)
Add topic