Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Cresco, Iowa
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Physical growth and development (1905β1913) === To meet Cresco's ever-changing educational requirements, a new high school building was erected in 1905. Citizens in the independent school district approved the project, with a budget not exceeding $25,000, in March that year. The construction bids were awarded in May, and by December, classes were already being held in the newly completed facilities. The structure, 100 feet by 80 feet, was built out of pressed brick and Postville stone. It reached a height of 84 feet from the grade line to the top of its dome. The cornice and bell tower were made of galvanized iron. Though called a high school, the building held classes for students in grades 3 to 12. The building's first floor consisted of the superintendent's office and five grade rooms. On the second floor was the seventh-grade room, six high-school classrooms, four recitation rooms, an assembly room, and a laboratory. The basement housed the manual training department and the furnace room. The building used a steam heating system and an advanced ventilation system. In 1910, ''The Howard County Times'' wrote: "a series of air ducts lead to the cupola where a number of radiators form an upward current that completely changes the air of all rooms in approximately three minutes. Fresh air from the outside is first warmed over radiators and then conducted to all the rooms, after which it passes out through the ducts leading to the cupola." In 1919, Cresco opened the east high school building and the West Ward school building. To finance these projects, bonds totaling $56,000 were issued.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Cresco, Iowa
(section)
Add topic