Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Frederikshavn
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===2015{{endash}}2020 port expansion=== In 2015 a large expansion of the port was started. The first of three phases was constructed from 2015 to 2018 by contractor [[Per Aarsleff (company)|Per Aarsleff]]. The official delivery from the contractor was on 8 June 2018.<ref name="kf-ny-udvidelse">{{cite web |last1=Frederiksen |first1=Michael |title=Havnens bestyrelse drøfter ny udvidelse |url=http://www.kanalfrederikshavn.dk/vis/nyhed/havnens-bestyrelse-droefter-ny-udvidelse/ |website=Kanal Frederikshavn |access-date=13 June 2018 |language=da |date=9 June 2018}}</ref> The officially inauguration coincided with the towns 200 year anniversary as a merchant town on 25 September 2018.<ref>{{cite web |last1=Frederiksen |first1=Michael |title=Kronprins Frederik besøger Frederikshavn |url=http://www.kanalfrederikshavn.dk/vis/nyhed/kronprins-frederik-besoeger-frederikshavn/ |website=Kanal Frederikshavn |access-date=6 July 2018 |language=da |date=6 July 2018}}</ref><ref name="pof-mc2018" /> The expansion makes it possible to receive larger ships and offshore installations, handle more bulk material and a flexible area for projects.<ref name="port-expansion">{{cite web|title=About the port expansion|url=http://pof.dk/about-the-port-expansion.aspx|website=Port of Frederikshavn|access-date=23 February 2018}}</ref> The first phase added 330.000 square metre hinterland and 600 metre of quay with a water depth 11 metre.<ref name="POF-stena-oil" /> Most of the quay and hinterland areas in the first phase have been leased by [[Louisiana]]-based Modern American Recycling Services for an 11-year period.<ref name="mars">{{cite web|title=Skrotgigant fra USA vil hyre 200 i Frederikshavn|last1=Østergaard|first1=Nicolai|url=http://www.soefart.dk/article/view/575935/skrotgigant_fra_usa_vil_hyre_200_i_frederikshavn#|website=Søfart|access-date=23 February 2018|language=da|date=19 December 2016}}</ref> In July 2018 they secured a contract to scrap the two platforms from [[Tyra Field]].<ref name="pof-mc2018" /> They are expected to begin the first recycling assignment in 2020{{update_after|2021}} and create more than 200 jobs.<ref name="pof-mc2019" /> Construction of Scandinavia's largest bunkering terminal is underway on the new area. It will consists of 11 storage tanks with a combined capacity of 744000 m<sup>3</sup>. It is scheduled for completion by the end of 2020{{Update after|2020}}. It will be leased to [[Stena Sphere|Stena Oil]].<ref name="pof-mc2019">{{cite web |title=Merry christmas and happy new year |url=https://pof.dk/news-(1)/merry-christmas-and-happy-new-year-(3).aspx |access-date=17 January 2020 |date=2019-12-18}}</ref><ref name="POF-stena-oil">{{cite web |title=Stena Oil |url=http://pof.dk/news-(1)/stena-oil.aspx |website=Port of Frederikshavn |access-date=13 June 2018 |language=en |date=4 May 2018}}</ref> In November 2018 all the hinterland areas of the first phase have been leased.<ref name="pof-ggd">{{cite web |title=Increased Storage Capacity |url=https://pof.dk/news-(1)/increased-storage-capacity.aspx |website=Port of Frederikshavn |access-date=2019-01-22|date=2018-11-30}}</ref> Five 2000 m<sup>2</sup> large warehouses have been constructed on the new area.<ref name="pof-mc2019" /> The planning of the second stage of the expansion was started in June 2017.<ref>{{cite web|title=The Port Prepares another expansion|url=http://pof.dk/news-(2)/the-port-prepares-another-expansion.aspx|website=Port of Frederikshavn|access-date=23 February 2018|language=en|date=8 June 2017}}</ref> Construction started in October 2017. It is nearly completed as of December 2019.{{Update after|2020|06}}<ref name="pof-mc2019" /><ref name="pof-mc2018" /> The second phase will add 170.000 square metre of hinterland and 400 metre of quay. The quay constructed in phase one will be deepened to 14 metres.<ref name="pof-mc2018" /> When the second phase is complete the total area of the harbour will be {{convert|950000|m2}}.<ref name="POF-stena-oil" /> A further expansion in third phase is an option if there is demand.<ref name="port-expansion" />
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Frederikshavn
(section)
Add topic