Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Yucca Mountain nuclear waste repository
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Nevada routes === [[File:Caliente Corridor.jpg|thumb|upright=3|The proposed transportation route of spent nuclear fuel through Nevada]] Within Nevada, the planned primary mode of transportation was via rail through the Caliente Corridor. This corridor starts in [[Caliente, Nevada|Caliente]], Nevada, traveling along the northern and western borders of the Nevada Test Site for approximately {{convert|200|mi}}. It then turns south.<ref>{{cite web | archive-url= https://web.archive.org/web/20070216221527/http://www.ocrwm.doe.gov/transport/eis.shtml |archive-date=February 16, 2007 | title= Environmental Impact Statement for the Alignment of a Rail Line in the Caliente Corridor | publisher= OCRWM, DoE | access-date= May 16, 2008 | url= http://www.ocrwm.doe.gov/transport/eis.shtml}}</ref> Other options that were being considered included a rail route along the Mina corridor. This rail route would have originated at the Fort Churchill Siding rail line, near [[Wabuska, Nevada|Wabuska]]. The proposed corridor would have proceeded southeast through [[Hawthorne, Nevada|Hawthorne]], [[Nevada State Route 265|Blair Junction]], Lida Junction and Oasis Valley. At Oasis Valley, the rail line would have turned north-northeast towards Yucca Mountain. Use of this rail corridor by the DOE would have required permission from the Walker River Paiute Tribe in order to cross their land. As the first {{convert|54|mi}} of the proposed corridor was owned by the U.S. Department of Defense (DoD), additional permission from the DoD would have to be granted.<ref>MinaFeasabilityStudyRev01_26OCT06_alt1.pdf.</ref> The Nevada Center for Biological Diversity and the Nevada Attorney General have expressed concern about the transportation routes, "through any number of sensitive habitats."<ref name=usa />
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Yucca Mountain nuclear waste repository
(section)
Add topic