Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Interstate 24
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== I-24 SMART Corridor === The {{convert|28|mi|km|adj=on}} stretch of I-24 between I-440 (exit 53) in Nashville and US 231 (exit 81) in Murfreesboro is currently in the process of being developed into the "I-24 SMART Corridor" in an effort to address congestion and mobility issues.<ref>{{cite web |title = I-24 SMART Corridor |url = https://www.tn.gov/tdot/projects/region-3/i-24-smart-corridor.html |publisher = Tennessee Department of Transportation |access-date = May 13, 2022 |archive-date = April 17, 2022 |archive-url = https://web.archive.org/web/20220417120338/https://www.tn.gov/tdot/projects/region-3/i-24-smart-corridor.html |url-status = live }}</ref> In recent years, this stretch of I-24 has become the most congested highway corridor in the state, due to the rapid growth of the region. The project pairs this stretch with the adjacent paralleling stretch of US 41/US 70S (Murfreesboro Road) and all connecting roads in between. The first phase, which ran from October 2018 to December 2021, included the construction of emergency pull-offs, improvements to multiple entrance and exit ramps, the erection of additional roadside [[dynamic-message sign]]s (DMSs), and upgrades to traffic signals along the corridor.<ref name="SMARTtimeline">{{cite web |title = I-24 SMART Corridor Timeline |url = https://www.tn.gov/tdot/projects/region-3/i-24-smart-corridor/timeline.html |publisher = Tennessee Department of Transportation |access-date = May 13, 2022 |archive-date = May 13, 2022 |archive-url = https://web.archive.org/web/20220513053707/https://www.tn.gov/tdot/projects/region-3/i-24-smart-corridor/timeline.html |url-status = live }}</ref> The second phase, which began in March 2022, includes the erection of 67 overhead gantries with signs between mileposts 53 and 70 that will display recommended [[variable speed limit]]s and variable lane control signs for each lane.<ref>{{cite news |last1 = Wenzel |first1 = Joe |last2 = Sulek |first2 = Marissa |title = TDOT: Construction to Start on Phase 2 of I-24 SMART Corridor Next Month |url = https://www.wsmv.com/2022/03/25/tdot-construction-start-phase-2-i-24-smart-corridor-next-month/ |access-date = May 13, 2022 |publisher = [[WSMV-TV]] |date = March 25, 2022 |location = Nashville, Tennessee |archive-date = March 25, 2022 |archive-url = https://web.archive.org/web/20220325165223/https://www.wsmv.com/2022/03/25/tdot-construction-start-phase-2-i-24-smart-corridor-next-month/ |url-status = live }}</ref><ref>{{cite news |last1 = McCarthy |first1 = Darby |title = I-24 SMART Corridor Project Begins Phase 2, Lane Closures from Nashville to Murfreesboro Beginning in April |url = https://www.newschannel5.com/news/i-24-smart-corridor-project-begins-phase-2-lane-closures-from-nashville-to-murfreesboro-beginning-in-april |access-date = May 13, 2022 |publisher = [[WTVF-TV]] |date = March 27, 2022 |location = Nashville, Tennessee |archive-date = April 19, 2022 |archive-url = https://web.archive.org/web/20220419110113/https://www.newschannel5.com/news/i-24-smart-corridor-project-begins-phase-2-lane-closures-from-nashville-to-murfreesboro-beginning-in-april |url-status = live }}</ref> The final phase will include the installation of [[ramp meter]]s on certain onramps and the installation of additional [[closed-circuit television]] (CCTV) cameras and DMS boards and [[Americans with Disabilities Act of 1990]] (ADA) improvements along connecting arterials.<ref name="SMARTtimeline"/>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Interstate 24
(section)
Add topic