Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Fort Pierce, Florida
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Economy== [[File:Farmers Market in Fort Pierce Florida 5.jpg|thumb|Fort Pierce Farmers Market]] {| class="wikitable sortable" |+ Largest employers<ref>[https://youredc.com/site_selection/major_employers Major Employers], St. Lucie EDC.</ref> |- ! No. !! Employer !! Employees |- | align=center | 1 || HCA Florida Lawnwood Hospital || align=center | 1,847 |- | align=center | 2 || Walmart Distribution Center || align=center | 1,273 |- | align=center | 3 || Pursuit Boats || align=center | 684 |- | align=center | 4 || Maverick Boat Group || align=center | 580 |- | align=center | 5 || City of Fort Pierce || align=center | 358 |} ===Port of Fort Pierce=== According to the [[U.S. Army Corps of Engineers]], an average of 350,000 tons of waterborne commerce moves through the Port of Fort Pierce annually. Major commodities which are dependent on the port include [[citrus]] exports, [[cement]] and [[aragonite]] imports. The last navigation improvements at [[Fort Pierce]] were authorized by the [[U.S. Congress]] in the [[Water Resources Development Act of 1988]], and construction was completed in August 1996. The existing entrance channel is {{convert|400|ft|abbr=on}} wide and {{convert|30|ft|abbr=on}} deep, the interior channel is {{convert|250|ft|abbr=on}} wide and {{convert|28|ft|abbr=on}} deep, the existing turning basin is {{convert|1100|ft|abbr=on}} square and {{convert|28|ft|abbr=on}} deep, and the north access channel is located immediately north of the main turning basin is {{convert|1250|ft|abbr=on}} feet long, {{convert|250|ft|abbr=on}} wide and {{convert|28|ft|abbr=on}} deep.<ref name="auto1">{{cite web|title=U.S. Army Corps of Engineers -- Congressional Fact Sheet -- Fort Pierce Harbor|url=https://www.saj.usace.army.mil/Portals/44/docs/CongressionalFS/2015/CSF_West_Palm_Beach_Canal_%28C51%29_%28C%29_CFS15.pdf}}</ref> In late 2014, dredging efforts were completed in the port. The dredging effort included placement of beach quality sand on the beach immediately south of the Inlet and placement of non-beach quality sand in the approved offshore disposal area.<ref name="auto1"/>
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Fort Pierce, Florida
(section)
Add topic