Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
District line
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Four Lines Modernisation (4LM) == {{See also|Four Lines Modernisation}} It was planned that a new signalling system would be used first on the sub-surface lines from the end of 2016,<ref name="MR3">{{cite news|last=Abbott|first=James|date=January 2013|title=Sub-surface renewal|pages=38β41|work=Modern Railways}}</ref> but signalling contractor Bombardier was released from its contract by agreement in December 2013 amid heavy criticism of the procurement process<ref>{{Cite web|date=3 January 2014|title=London Underground and Bombardier abandon Tube signalling contract|url=https://www.railjournal.com/financial/london-underground-and-bombardier-abandon-tube-signalling-contract/|access-date=2 June 2020|website=International Railway Journal|language=en}}</ref> and London Underground subsequently awarded the contract for the project to [[Thales Group|Thales]] in August 2015.<ref>{{Cite web|date=13 October 2017|title=London Underground resignalling reaches milestone|url=https://www.railjournal.com/signalling/london-underground-resignalling-reaches-milestone/|access-date=2 June 2020|website=International Railway Journal|language=en}}</ref> With the introduction of S7 Stock, the track, electrical supply, and signalling systems are being upgraded in a programme planned to increase peak-hour capacity on the line by 27 per cent by the end of 2023.<ref name="MR3" /><ref name="TfL-upgrade2">{{cite web|date=February 2011|title=Our Upgrade Plan|url=http://www.tfl.gov.uk/assets/downloads/corporate/our-upgrade-plan-london-underground-february-2011.pdf|url-status=dead|archive-url=https://web.archive.org/web/20120817225410/http://www.tfl.gov.uk/assets/downloads/corporate/our-upgrade-plan-london-underground-february-2011.pdf|archive-date=17 August 2012|access-date=7 December 2012|publisher=Transport for London}}</ref><ref>{{Cite web |title=Four Lines Modernisation|url=https://www.tfl.gov.uk/travel-information/improvements-and-projects/four-lines-modernisation|access-date=2 June 2020|website=Transport for London|language=en-GB}}</ref> A single control room for the sub-surface railway opened at Hammersmith on 6 May 2018, and [[Communications-based train control|Communications Based Train Control (CBTC)]] provided by Thales will progressively replace 'fixed block' signalling equipment dating back to the 1940s.<ref name="MR3" /><ref name="MR22">{{cite news|last=Stewart|first=Rob|date=January 2013|title=Cityflo 650 to control the SSR|pages=42β43|work=Modern Railways}}</ref> The rollout of CBTC has been split into sections, each known as a Signal Migration Area (SMA), and are located on the line as follows:<ref>{{Cite journal|date=October 2020|title=Underground News|journal=London Underground Railway Society|volume=706|pages=572}}</ref> {| class="wikitable sortable" |+ style="text-align: left;" | District line Signal Migration Areas !data-sort-type="number"|{{Abbr|SMA|Signal Migration Area}}{{efn-lr|SMAs 0.5, 1, 8β9 and 13β14 concerns parts of the Circle, Hammersmith & City, and Metropolitan lines.}} !from !class="unsortable"|to !status !data-sort-type="isoDate"|date |- |2 |Paddington |Edgware Road |commissioned |data-sort-value="2019-09" | September 2019 |- |3 |Monument |Stepney Green |completed |data-sort-value="2020-07" | July 2020 |- |4 |Monument |Sloane Square |completed |data-sort-value="2020-08" | August 2020 |- |5 |Sloane Square |{{plainlist| * Olympia * Barons Court * Fulham Broadway * Paddington{{efn-lr|SMA 5 from Sloane Square to Paddington includes the District line from Sloane Square to Earl's Court, and from Earl's Court to Paddington.}} }} |completed |data-sort-value="2022" | March 2022 |- |6 |Stepney Green |Becontree |completed |data-sort-value="2022" | January 2023 |- |7 |Becontree |Upminster |completed |data-sort-value="2023" | March 2023 |- |10 |Barons Court |{{plainlist| * Stamford Brook }} |planned |data-sort-value="9999" | TBD |- |11 |Stamford Brook |Richmond |deferred |data-sort-value="9999" | until further notice |- |12 |Fulham Broadway |East Putney |planned |data-sort-value="9999" | TBD |} {{notelist-lr}}
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
District line
(section)
Add topic