Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Sharon Springs, New York
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Delayed plans === As of September 2011, no work has commenced on the project and the purchased historic structures are in deteriorating condition. Buildings such as the Adler and Imperial Baths, which were in use recently before the purchase, may now be in need of immediate and emergency stabilization.{{citation needed|date=December 2012}} In late June 2013, SSI suggested that plans were back on track although they would require approval from the Sharon Springs council. Per SSI partner AidenHan, their attorney and surveyor Joanne Crum brought details of the long-proposed SSI Imperial Baths project to the Sharon Springs Joint Planning Board on June 26. A formal application for the proposed work, which focused solely on the Baths with no mention of the Adler, was not presented. In the Planning Board meeting, Ms. Crum said, "There are three smaller buildings at the site and the remains of a fourth will be removed, but they will be able to salvage the Imperial Baths and gazebo, both of which will be renovated and restored." {{citation needed|date=March 2021|reason=No source for the quote}} Sharon Springs Inc. received a $5 million loan from Noah Bank in New Jersey in September 2013, along with the utilization of a $1 million Restore NY grant. The money from these sources went directly towards the razing of the Hotel Washington<ref>{{cite web| url = http://www.bizjournals.com/albany/blog/2013/09/off-the-list-big-plans-in-a-small-town.html?page=2| url-status = dead| archive-url = https://web.archive.org/web/20130926074940/http://www.bizjournals.com/albany/blog/2013/09/off-the-list-big-plans-in-a-small-town.html?page=2| archive-date = September 26, 2013| title = Could Sharon Springs NY see big investment from Korean group? - Albany Business Review}}</ref> in mid September and were to help fund roof work on the Adler Hotel. By the end of 2013, a decision was to be made about whether to save or raze the Adler Hotel. Additionally, the funds were to go to the restoring of the Imperial Baths structures.<ref>{{cite web| url = http://www.bizjournals.com/albany/blog/2013/09/eight-years-later-spa-plans-excite.html?page=all| url-status = dead| archive-url = https://web.archive.org/web/20131110182241/http://www.bizjournals.com/albany/blog/2013/09/eight-years-later-spa-plans-excite.html?page=all| archive-date = November 10, 2013| title = SBA loan helps Sharon Springs, NY spa plan - Albany Business Review}}</ref> At the close of 2014, the execution of the proposed plans listed above have still not materialized.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Sharon Springs, New York
(section)
Add topic