Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Special pages
Niidae Wiki
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Eschede train disaster
(section)
Page
Discussion
English
Read
Edit
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Consequences== ===Legal=== Immediately after the accident, Deutsche Bahn paid 30,000 [[Deutsche Mark]]s (about [[US$]]19,000) for each fatality to the applicable families. At a later time Deutsche Bahn settled with some victims. Deutsche Bahn stated that it paid the equivalent of more than 30 million U.S. dollars to survivors and the families of victims.<ref name="Seconds" />{{time needed|date=January 2017}} In August 2002, two [[Deutsche Bahn]] officials and one engineer were charged with [[manslaughter]]. The case ended in a [[plea bargain]] in April 2003. According to the German code of criminal procedure, if the defendant has not been found to bear substantial guilt, and if the state attorney and the defendant agree, the defendant may pay a fine and the criminal proceedings are dismissed with prejudice and without a verdict. Each engineer paid [[β¬]]10,000 (around US$12,000).<ref name="Seconds" />{{time needed|date=January 2017}} [[File:Sollbruchstelle ICE1.jpg|thumb|ICE 1 train window with predetermined breaking point and emergency hammer]] ===Technical=== Within weeks, all wheels of similar design were replaced with [[monobloc wheel]]s. The entire German railway network was checked for similar arrangements of switches close to possible obstacles. Rescue workers at the crash site experienced considerable difficulties in cutting their way through the train to gain access to the victims. Both the [[aluminium]] framework and the pressure-proof windows offered unexpected resistance to rescue equipment. As a result, all trains were refitted with windows that have breaking seams.
Summary:
Please note that all contributions to Niidae Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Encyclopedia:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
Eschede train disaster
(section)
Add topic